Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Bridge assembly risk model construction method and system based on BIM

A technology of risk model and construction method, which is applied in the direction of geometric CAD, can solve the problems of low modeling efficiency and modeling precision, complex bridge structure, etc., and achieve the effect of preventing accidents, ensuring construction safety, and precise positioning

Pending Publication Date: 2022-07-01
GUIZHOU UNIV OF ENG SCI +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, BIM technology is mainly based on manual modeling in the modeling of railway bridges. However, when the bridge structure is complex and the design needs to be revised repeatedly, the drawbacks of manual modeling, such as low modeling efficiency and low modeling accuracy, are becoming more and more obvious.
Among them, the research on the basic theory of risk management and control has been relatively complete. What is lacking is how to ensure the effective operation of the risk management and control system through intelligent means, that is, to realize real-time dynamic assessment of safety risks and early warning, and effective implementation of risk management and control measures.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge assembly risk model construction method and system based on BIM
  • Bridge assembly risk model construction method and system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0037] The embodiment of the present invention discloses a BIM-based bridge assembly risk model construction method, such as figure 1 shown, including the following steps:

[0038] The bridge structure, construction method and construction stage are modularized and decomposed;

[0039] Clarify the control parameters and structural relationships of each structure, and initially establish the parametric model of the bridge structure, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a BIM-based bridge assembly risk model construction method and system, and relates to the field of bridge assembly. The method comprises the following steps that modular decomposition is conducted on a bridge structure, a construction mode and a construction stage; control parameters and structural relations of all the structures are determined, and parameterized models of the bridge structure, the construction mode and the construction stage are preliminarily established; debugging the parameterized model, and constructing a parameter library; and creating a BIM risk source management system according to the parameter library, and establishing a risk source information model. On the basis of a traditional risk management and control theory, real-time dynamic assessment and early warning of security risks can be realized.

Description

technical field [0001] The invention relates to the field of bridge assembly, in particular to a BIM-based method and system for building a bridge assembly risk model. Background technique [0002] The core of BIM is to establish a virtual three-dimensional model of construction engineering and use digital technology to provide a complete and actual construction engineering information database for this model. The information base not only contains the geometric information, professional attributes and state information describing building components, but also contains the state information of non-component objects (such as space and motion behavior). With the help of this three-dimensional model containing construction engineering information, the information integration degree of construction engineering is greatly improved, thereby providing a platform for the exchange and sharing of engineering information for stakeholders of construction projects. [0003] At present, ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F30/13
CPCG06F30/13
Inventor 孙延华王锦张晓虎张效忠孙国民
Owner GUIZHOU UNIV OF ENG SCI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products