An assembly method and a technology of connecting parts, which are applied in the direction of building components, buildings, sustainable buildings, etc., can solve the problems of affecting the safety performance of the device, poor earthquake resistance, and connecting parts that cannot be connected, so as to solve the problems of poor fixing performance and increase reinforcement performance, the effect of improving the fixing performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] First, as Figure 1-8 As shown, the present invention provides a light-weight steel structure building connector, including a connecting column 1, a connector main body 2, a fixing plate 3, a splint 4 and a steel structure rod 5, and the outer side of the connecting column 1 is provided with a connector main body 2, The bottom of the connector main body 2 is movably sleeved with the sleeve connector 21 , the two ends of the connector main body 2 are fixedly installed with a fixing plate 3 , the bottom of the inner cavity of the fixing plate 3 is fixedly installed with a splint 4 , and the interior of the fixing plate 3 is provided with a connection The inner side of the splint 4 is provided with a steel structure rod 5, the inner side of the connector main body 2 is movably installed with an auxiliary member 20, the outer side of the auxiliary member 20 is provided with a connecting port, and the middle part of the inner cavity of the auxiliary member 20 is fixedly insta...
Embodiment 2
[0040] like Figure 1-8 As shown, on the basis of Embodiment 1, the present invention provides a technical solution: preferably, an extrusion block 32 is fixedly installed at the bottom of the inner side of the fixed plate 3, and a telescopic column 33 is fixedly installed inside the extrusion block 32, A compression pad 34 is fixedly installed at the bottom of the column 33 , a fixing hole 31 is opened in the interior of the fixing plate 3 , a pressing pad 341 is fixedly installed in the inner of the pressing pad 34 , and a buffer column 342 is fixedly installed in the inner of the pressing pad 341 . A sponge pad 343 is fixedly installed at the bottom of 341, a telescopic pressure column 344 is fixedly installed inside the sponge pad 343, a rubber pad 345 is fixedly installed at the bottom of the sponge pad 343, a friction block 346 is fixedly installed at the bottom of the rubber pad 345, and the telescopic pressure column is fixedly installed. The two sides of the inner cav...
Embodiment 3
[0043] Second, as Figure 1-8 As shown, the present invention also provides an assembly method of a light-weight steel structure building connector: the assembly method of the light-weight steel structure building connector includes the following steps:
[0044] Step 1: Socket the connector;
[0045] Step 2: Weld the connection block;
[0046] Step 3: Assemble the connecting rod;
[0047] The connecting piece is sleeved on the base column, and the upper and lower ends of the connecting piece are welded to the fixed plates with the welding device, and then the connecting piece is manually stretched, the auxiliary rod is inserted at a suitable length, and the top of the auxiliary rod is inserted. The buffer plate is inserted to increase the stability of the connection, and then the threaded rod is threaded on the side for fixed installation.
[0048] In this embodiment, the connecting piece is sleeved on the outside of the base column, the connecting piece is manually pulled,...