Testing device and method for simulating development process of crack induced by frost heaving of lining structure
A technology of development process and test device, applied in the field of geotechnical engineering, can solve problems such as ice hanging, tunnel inoperability, damage to tunnel safety, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] In order to better understand the purpose, structure and function of the present invention, the present invention will be described in further detail below with reference to the accompanying drawings.
[0019] refer to figure 1 , figure 2 As shown, a test device for simulating frost heave deformation of tunnel lining structure cracks of the present invention includes a sample installation and testing system, a fixing device, a refrigeration system, a pressure control system, and a data acquisition device; the tunnel lining 12 is placed in the sample installation and testing system. Inside, the fixing device is used to seal the sample installation test system, the pressure control system is used to control the pressure in the sample installation test system, simulate the external pressure and pore water pressure, the refrigeration system is used to regulate the internal temperature of the sample installation test system, the simulation The data acquisition device is us...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com


