Preparation method of steel slag pavement brick with net hole structure and water penetrating function
A technology of permeable pavement bricks and pore structure, which is applied to pavements, roads, roads and other directions paved with prefabricated blocks, can solve the problems of management costs, environmental pollution, occupation of land, etc., to protect the environment, reduce production costs, save money energy effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0018] Example 1: Screen out steel slag particles with a particle size of 5 to 10 mm, and make steel slag pavement permeable bricks according to the ingredient ratio in Table 1. The specific production steps are as follows:
[0019] (1) Use sieves with apertures of 10mm and 2.5mm in advance to select steel slag particles with a particle size of 2.5-10mm. Weigh the raw materials of the bottom layer and the upper layer respectively in proportion.
[0020] (2) Put the bottom part of the raw material into the mixing container, and first mix the dry powder raw material and steel slag particles evenly. Pour in a certain amount of water and continue to stir evenly to make the dry powder, steel slag particles and water evenly mixed. The stirring speed and strength of this step are basically close to the situation of the mixer when making the cement glue sand test block, and the stirring time after adding the solution is kept at 1.5 to 2 minutes.
[0021] (3) 35-70 seconds after the ...
Embodiment 2
[0026] 2. Example 2: Screen out steel slag particles with a particle size of 2.5 to 10 mm, and make steel slag pavement permeable bricks according to the ingredient ratio in Table 3. The specific production steps are as follows:
[0027] (1) Use sieves with apertures of 10mm and 2.5mm in advance to select steel slag particles with a particle size of 2.5-10mm. Weigh the raw materials of the bottom layer and the upper layer respectively in proportion.
[0028] (2) Put the bottom part of the raw material into the mixing container, and first mix the dry powder raw material and steel slag particles evenly. Pour in a certain amount of water and continue to stir evenly to make the dry powder, steel slag particles and water evenly mixed. The stirring speed and strength of this step are basically close to the situation of the mixer when making the cement glue sand test block, and the stirring time after adding the solution is kept at 1.5 to 2 minutes.
[0029] (3) 35-70 seconds after...
PUM
| Property | Measurement | Unit |
|---|---|---|
| particle diameter | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More