Desert tackling method
A desert and sandy soil technology, applied in soil protection, construction, infrastructure engineering, etc., can solve the problems of low effect, long cycle, large investment, etc., to reduce the degree of sun exposure, reduce the speed of aging, prevent The effect of land desertification
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0026] figure 1 , figure 2 The illustrated embodiment includes the following steps:
[0027] a. Lay artificial turf 1 with a width of about 12 meters on the surface of the desert;
[0028] b. Cut out several linear incisions 11 on the artificial turf, use the umbrella-shaped nails 3 to pass through the linear incisions 11 of the artificial turf and drive into the sandy soil layer 4, so that the heads of the umbrella-shaped nails 3 are pressed on the horizontal bead 7, horizontally The long direction of the bead 7 is perpendicular to the direction of the linear incision 11, and the artificial turf is compressed and fixed;
[0029] c. Use the drilling machine to drill the underground soil layer of the desert to measure the water content of the underground soil layer in the desert;
[0030] d. Cut out a number of circular holes with a diameter of about 0.6 meters on the artificial turf to form a circular planting hole 2. The density of the planting holes 2 is determin...
Embodiment approach 2
[0038] A second embodiment of the present invention includes the following steps:
[0039] a. Lay artificial turf 1 with a width of about 9 meters on the desert surface;
[0040] b. Use the drilling machine to drill the underground soil layer of the desert to measure the water content of the underground soil layer in the desert;
[0041] c. Cut out a number of square holes of 0.4m x 0.4m on the artificial turf to form planting holes. The density of the planting holes is determined according to the water content of the desert underground, and one is set for every 45 square meters;
[0042] d. Use the locating nail 3 with the hollow hole up and down to pass through the artificial turf and drive into the sandy soil layer 4. After the locating nail 3 is driven into the sandy soil layer, remove the sandy soil in the hollow hole and inject fluid foam plastic 31 into the hollow hole. The foam plastic 31 passes through the hollow hole and reaches the sandy soil layer at the bottom of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com