A technology of support device and tunnel, applied in the field of combined support device for open tunnels, can solve the problems of high labor intensity of manual assembly and disassembly, prolonging construction time, affecting work efficiency, etc., to solve personal injury accidents, save wood resources, The effect of improving work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] For the situation that the open tunnel composite support device is used in general soil tunnels,
[0054] see Figure 1-Figure 11, Mingkai tunnel combination support device mainly includes: hoisting frame 1, metal structure split column 4, support plate placement frame 10, support plate 11, support bar assembly 12 and support plate extruder 14, etc. The hoisting frame includes: the four corners of the hoisting frame are symmetrically fixed with a lifting pulley 18 for connecting the metal structure split column hook 8 and a support plate placement frame 10, a lifting hook 2 and four manual winches 3 connected with the lifting hook. ; Its metal structure split column 4 comprises: the main column 9 that has installation groove in front, is welded on the side wing 5 that is equilateral triangle on both sides of main column, the split column hook 8 that is installed on the main column upper end and is welded on the installation The support bar placement frame 7 at the uppe...
Embodiment 2
[0071] When encountering tunnels with special soil quality, the structure of embodiment 1 is adopted for the tunnel composite support device.
[0072] The above-ground installation and operation method of the open tunnel combined support device includes the following steps:
[0073] When the tunnel is dug to a safe height, put a set of tunnel support assembly 15 assembled according to the above steps 1 to 5 into the dug tunnel, fasten the bolt 12-5 and the nut by the brace 12-4 Fasten the support bar assembly 12 and the metal structure split column 4, and continue to excavate the tunnel. When excavating to the collapsed part or the special soil such as quicksand layer, place the support plate 11 on this part, and then place the The spreader extruder 14 passes through the jack 6 of the spreader extruder, and is placed on the front side of the dug out spreader 11, and the adjustment bolt 14-1 of the spreader extruder is turned to make the spreader extruder The adjustment block ...