The invention discloses pressurized water experiment equipment based on 
coal body or rock-body loose circle detection. The equipment comprises a 
test probe, a drilling 
machine, a drilling rod and a control operation bench. The 
test probe comprises a connection 
pipe. The connection 
pipe is arranged along a 
drill hole. A front portion, a middle portion and a 
tail portion of the connection 
pipe are provided with a front portion plugging device, a middle portion plugging device and a 
tail portion plugging device. When a plugging cavity is filled with water, the front portion plugging device, the middle portion plugging device and the 
tail portion plugging device separate the 
drill hole so as to form a number one water injection cavity and a number two water injection cavity. The drilling 
machine is connected to the 
test probe through the drilling rod so as to lengthen and advance the test probe to a designated area. The control operation bench comprises a 
high pressure flexible pipe. The control operation bench is connected to the drilling 
machine through the 
high pressure flexible pipe. In the invention, integration of plugging and testing of the test probe is realized, the number ofpipelines which work simultaneously in the 
drill hole is reduced, a problem of mutual intertwining of multiple pipelines in the 
drill hole during an advancement process is solved, and stability of a measurement process of a rock 
mass damage range is improved.