Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

5results about How to "Good practice" patented technology

Sectional type sintering method for anode foil of aluminum electrolytic capacitor

The invention belongs to the field of aluminum electrolytic capacitors, and particularly relates to a sectional type sintering method of an aluminum electrolytic capacitor anode foil, which comprises the steps of slurry preparation, coating, drying and sintering, when the slurry is prepared, the slurry can be fully bonded by adding a very small amount of binder, the redundant binder can be easily removed in the first stage of sintering, and a large number of tiny holes are formed in the surface of an aluminum powder layer; the tiny holes are beneficial to absorbing deformation energy when the anode foil is bent, so that cracks are reduced, the bending performance of the sintered foil is greatly enhanced, and the formed anode foil has more excellent mechanical properties; in the second stage of sintering, sufficient combination of the aluminum powder and the aluminum foil substrate is guaranteed; and meanwhile, a good sintering neck is formed between the aluminum powder and the aluminum powder, so that the aluminum sintered foil has good bending resistance.
Owner:DONGGUAN AILLEN ELECTRONICS TECH CO LTD

A skid-mounted filling device with pipeline leakage early warning mechanism

ActiveCN224414928Ugood practiceImplement visual warningsStructural engineeringReliability engineering
The utility model discloses a pry dress filling device with pipeline leakage early warning mechanism relates to fluid filling equipment technical field, including pry dress base, the upper end four corners of pry dress base all are fixedly connected with support column, and the upper end fixedly connected with top plate of support column, and the fixedly connected with three curb plates between pry dress base and top plate, and the fixedly connected with the explosion -proof baffle between top plate and pry dress base, and the area between top plate and pry dress base is divided into liquid storage area and electrical area by explosion -proof baffle, and the utility model discloses a mechanical contact formula grading early warning structure formed by first conducting block, second conducting block and third conducting block and first conducting terminal, second conducting terminal and third conducting terminal, can according to the pressure change of liquid outlet pipe and trigger different early warning level to realize the visualization warning of micro -leak, moderate leak, serious leak, and the corresponding processing measure of staff is convenient according to the different of leakage degree and in time.
Owner:SHANDONG KUNWEI METAL STRUCTURE CO LTD

Fully automatic identification method, system and device for foundation coefficient

The present invention discloses a fully automatic identification method, system and device for foundation coefficient, and relates to the technical field of data identification. After collecting foundation-related data in a construction area, a foundation coefficient identification model is trained and obtained. The foundation coefficient of each detection point in the construction area is identified using the foundation coefficient identification model. If there is an abnormality in the foundation coefficient, a multi-level alarm instruction is sent to the outside through multiple channels. After adjusting the warning threshold using the trained threshold adjustment model, a hidden danger area is screened out in the construction area according to the position of the detection point and the value of the foundation coefficient. The real-time risk data in the hidden danger area is used as input, and the trained construction risk identification model is used for scoring, and the corresponding risk treatment measures are matched in the hidden danger area according to the obtained risk score. After identifying and screening the hidden danger area in the construction area through the value of the foundation coefficient and its location information, targeted treatment measures are taken.
Owner:THE 2ND ENG CO LTD OF CHINA RAILWAY 17 BUREAU GRP

Implant device and implant system

PendingCN122272033Afast implantimplant efficientImplanted deviceSurgery
This disclosure provides an implantation device and an implantation system. The implantation device includes: a receiving mechanism, the receiving mechanism including a first receiving portion; and an implantation component, the implantation component being housed in the first receiving portion, at least a portion of the implantation component being movable relative to the first receiving portion to drive the movement of electrodes attached to the implantation component; wherein the electrodes are capable of acquiring electrical signals from biological tissue or applying electrical stimulation to biological tissue. The solution of this disclosure can reliably improve at least one of implantation efficiency and implantation accuracy.
Owner:SHANGHAI STAIRMED TECHNOLOGY CO LTD

Petroleum drilling PDC drill bit balling drum judging, processing and preventing method

The invention discloses a petroleum drilling PDC (Polycrystalline Diamond Compact) drill bit balling drum judging, processing and preventing method, which comprises the following steps of: S1, setting a drill bit balling drum parameter symptom risk trend as Aprogressive, and when the Aprogressive reaches a corresponding area value, judging that a slight drill bit balling drum, a serious drill bit balling drum or a balling drum drilling jamming risk occurs underground; s2, setting the drill bit balling occurrence support degree as K, determining no drill bit balling when K is less than 20%, determining slight drill bit balling when K is more than or equal to 20% and less than 55%, determining serious drill bit balling when K is more than or equal to 55% and less than 85%, and determining balling jamming when K is more than 85%; s3, after the two indexes of the A < progressive > and the K value are synthesized, the bit balling degree Bj is judged, B1 is no bit balling, B2 is slight bit balling, B3 is serious bit balling, and B4 is balling jamming; and when the conclusions of the two judgment indexes are inconsistent, processing is carried out according to a relatively serious condition. According to the method, the underground balling risk can be accurately judged, the tripping frequency is reduced, and the construction period is shortened.
Owner:SINOPEC OILFIELD SERVICE CORPORATION +1