The present invention discloses a box test device for a model carrier
pile, comprising a box frame
system, a jack loading
system arranged above the box frame
system, and a sleeve system located in the box frame system. The present invention also discloses a box test method for a model carrier
pile, wherein a soil layer is buried in the box frame system to a first preset depth; a sleeve system is placed in the box frame system, and the soil layer is continuously buried to the casing opening;
gypsum mixed sand is used as a filling carrier filler to be filled into the casing; a jack loading system is used to pressurize a long rammer to tamp the carrier filler in the casing until it is compacted; a steel cage is placed in the casing, concrete is poured, and the casing is pulled out while pouring; after the
pile in the casing is formed, the soil layer is peeled from top to bottom, and samples are taken layer by layer to determine the
dry density, and the carrier pile forming condition is observed and analyzed. The present invention performs a full pile
simulation test on the carrier pile to improve the referenceability of the carrier pile
simulation experiment.