Novel embedded part for vibration isolation bearing and mounting method thereof
A technology of seismic isolation bearings and embedded parts, which is applied in the direction of earthquake resistance, building components, building types, etc., can solve problems such as waste, and achieve the effects of saving steel, large economic value, engineering applicability, and convenient installation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] As shown in Figures 1 to 4, the pre-embedded part of the seismic isolation support of the present invention includes a pre-embedded rib 1, a steel plate 2 and a matching nut 3, wherein one end of the pre-embedded rib 1 is vertically welded on one end surface of the steel plate 2, The two ends of the nut 3 are smooth and the outer surface is rough, the nut 3 is welded on the other end of the steel plate 2, its screw hole is perpendicular to the steel plate 2, and the pre-embedded rib 1 and the nut 3 are located on the same central axis.
[0026] When the seismic isolation support 4 is connected with the lower structure 5 of the building, first calculate the number of the required embedded parts, and set it in the lower structure 5. After pouring the concrete of the lower structure, connect the supporting nut 3 with The bolts 6 on the seismic support are connected together; when the seismic isolation support 4 is connected with the superstructure 7 of the building, first c...
Embodiment 2
[0028] A method for installing the embedded part of the seismic isolation support described in Embodiment 1, it comprises the following steps:
[0029] (1) According to the size of the seismic isolation bearing, calculate the number of embedded parts required according to the general mechanical formula and method;
[0030] (2) According to the size of the isolation bearing and the number of embedded parts, calculate the length and diameter of the embedded reinforcement according to the general mechanical formula and method;
[0031] (3) Evenly distribute the selected embedded parts in the superstructure and / or substructure of the building directly opposite to the installation position of the seismic isolation bearing, and use the general temporary positioning device for positioning during construction. All embedded parts The end face of the nut should be on the same plane;
[0032] (4) Temporarily cover the upper end surface of the supporting nut of the embedded part;
[003...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 