[0007] When the continuous method is adopted, the diaphragm wall is a temporary structure, so it needs to be demolished during the underground structure
engineering stage of the building, but the diaphragm wall will cause a sudden change during the demolition process imbalance of stress
Moreover, danger may occur during the demolition process, and it is difficult to carry out construction due to mutual interference with the underground structure, so not only the loss of raw materials is caused, but also there are problems such as the need to leave a predetermined time for the demolition operation
In addition, it may cause deformation of the surrounding ground to cause defects in the surrounding structure, and due to the small spacing of the intermediate support piles provided to prevent the bending of the horizontal supports, it hinders the progress of underground excavation work by the equipment, and The construction period is extended due to the interference of temporary components during the construction work
[0008] With the SPS method, since the pillars (PRD foundation) which are permanent vertical components are constructed before excavating the ground, the interval between the pillars is small and excavation work is difficult; As a permanent horizontal skeleton structure, the H-truss beam is connected to the pillar to play the role of horizontal support. However, due to the construction error of the pillar, the H-truss beam must be actually measured before manufacturing, so the construction period is lengthened, and because only The connection work with the pillar
steel frame can be carried out by on-site
welding, so there are difficulties in
quality managementAlso, the H-truss as a horizontal support needs to be able to
resist large earth pressure, but the H-truss has a strong axis and a weak axis, and the size of the component is determined by the bending of the weak axis direction, so special Manufacture of H-truss with a large width will increase the volume and cost, and since the width of the H-truss as a horizontal support becomes large, it is difficult to install the reinforcement and formwork of the pillar formed by the
steel frame and
reinforced concrete group
[0009] When using the reverse method, since the operation of the tank wall and RCD foundation can only be carried out with large equipment, it is difficult to use in small or difficult-to-access places, and Since the pillars (RCD foundation) which are permanent vertical components are first constructed before the underground excavation work, the distance between the pillars is small and the underground excavation work is difficult; due to the upside-down method, it is difficult to connect the already poured upper part with the poured lower part the concrete
Also, the steel bars of the horizontal frame structure made of
reinforced concrete interfere with the H-truss of the vertical structure already installed, so it is difficult to connect or
handle, and it is difficult to perform
quality controlIn addition, due to construction errors in the vertical components set before excavating the foundation, it is difficult to compensate