Nacelle-moving construction method for wide span and big area suspended ceiling
A construction method and large-span technology, applied in the direction of roofs, dome roof structures, building components, etc., can solve the problems of affecting the normal operation of the ground, wasting manpower, material resources, increasing construction costs, etc., to save turnover material costs and costs. , the effect of accelerated construction progress
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0011] The large-span large-format suspended ceiling mobile hanging basket construction method is to install two chain hoists on each truss 1 upper chord on the adjacent axis of the large-span large-format suspended ceiling, and the two chain hoists are connected and tightened. The wire rope 3, a hanging basket 4 is hung between the two wire ropes 3, as an operation platform for the construction personnel, the hanging basket 4 is connected with a rope 5 for the traction movement of the hanging basket 4; then, set at the upper chord web rod of the truss 1 The pulley 6 hoists the ceiling plate 2 to the installation position through the pulley 6, and the construction personnel in the hanging basket 4 install and fix the ceiling plate 2.
[0012] If you choose to build a rain awning without platform columns at Nanjing Station, it can be calculated that the platform is 543.5 meters long from east to west and 92.3 meters wide from north to south. The structure is a spatial inverted tria...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap