A connecting section and combined technology, applied in the installation of bolts, infrastructure engineering, construction, etc., can solve the problems of cost reduction, strength reduction, large grouting resistance, etc., to reduce manufacturing costs, save materials, and achieve smooth grouting. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] As shown in the figure, the orifice connecting section of a combined bolt is composed of a hollow bolt body 1b and a connecting section 1c. The hollow bolt body 1b and the connecting section 1c are connected as a whole, of course, they can also be connected by threads. The outer surface of the opposite end of the hollow anchor body 1b and the connecting section 1c is provided with external threads for mating with the nut 5; the inner cavity 2 of the connecting section 1c is connected and matched with the solid anchor body 4, and the connection method is threaded connection Or squeeze connection.
[0035] The connecting section 1c and the central anchor body 1b are both a circular steel pipe, and the middle part of the connecting section 1c is molded to form an enlarged section 1a, and the length of the enlarged section 1a is approximately 1 to 3 times the outer diameter of the circular steel pipe. The length of the hollow bolt body 1b is generally 100-6000 mm; the length of...