Quick load test method for bridge carrying capacity
A technology of load test and bearing capacity, applied in the field of bridge construction, can solve the problems of large influence of human factors and large traffic interference in the structure inspection method, and achieve the effects of improving the test time, reducing the traffic interference and increasing economic benefits.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as image 3 As shown, a three-span continuous girder bridge with a span combination of 58.96m+100m+76.96m adopts a three-span prestressed concrete variable cross-section single-box single-chamber continuous box girder. The height of the box girder is 2.97m from mid-span to The 2m of the center of the main pier changes to 5.77m according to the quadratic parabola.
[0025] Such as figure 1 Shown is the entire bridge evaluation process. The rapid load test method for bridge bearing capacity of the present invention is used in the bridge evaluation process and can be performed before the conventional load test steps.
[0026] Such as figure 2 As shown, the rapid load test evaluation method of bridge bearing capacity adopts the following steps:
[0027] (1) Conduct quasi-static load test steps on the bridge site
[0028] The quasi-static load test uses two 20-ton trucks to pass the bridge in parallel and slowly on different lanes, and the combination of different ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com