Method for smooth blasting construction with pre-eccentric uncoupling charging

A technology of smooth blasting and construction methods, applied in blasting, ammunition, offensive equipment, etc., can solve problems such as formation of unfavorable high-quality slopes, and achieve the effect of improving integrity, rational use of energy, and improved blasting effect

Active Publication Date: 2009-09-30
CHINA RAILWAY NO 2 ENG GRP CO LTD +1
View PDF0 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In smooth surface blasting, the tangent between the charge and the slope should be avoided as far as possible, and in smooth blasting, the tangent between the charge and the slope should be avoided as much as possible, while the traditional uncoupled charging method is that the charge is cut on the surface or Placed in the middle of the hole, it is not conducive to high-quality side slope formation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0015] Below by embodiment the present invention will be further described:

[0016] preferred embodiment

[0017] The smooth surface blasting construction method of the front eccentric uncoupled charge is characterized in that it comprises the following steps:

[0018] (1) Drill holes according to the design requirements, and clean up the debris in the hole and on the edge of the hole after drilling to prevent the debris from blocking the blast hole;

[0019] (2), process the drug string: the drug string is processed outside the hole according to the design, and the ratio of the diameter of the drilled charge hole to the diameter of the drug string or the non-coupling coefficient is 3.0---4.0;

[0020] (3) Install the processed bracket on the drug string according to the spacing required by the construction;

[0021] (4) Slowly put the drug string close to the wall of the upper hole, that is, the side of the light blasting body, and block the blasting hole;

[0022] (5), d...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for smooth blasting construction, and in particular relates to a method for smooth blasting construction with pre-eccentric uncoupling charging. The invention aims to provide the method for the smooth blasting construction with pre-eccentric uncoupling charging, which can improve the side slope smooth blasting effect. The technical proposal comprises that the method for the smooth blasting construction with pre-eccentric uncoupling charging comprises the following steps: (1) drilling a hole according to design requirement, cleaning up sundries in the hole and beside the hole after drilling the hole to prevent the blasting hole from being blocked by the sundries; (2) processing an ammunition string: processing the ammunition string outside the hole according to the design, wherein the size ratio of the diameter of the charging hole to the diameter of the ammunition string or the uncoupling coefficient is between 3.0 and 4.0; (3) mounting well-processed brackets on the ammunition string at intervals according to construction requirements; (4) putting the ammunition string into the blasting hole slowly by pressing close to the upper hole wall, namely one side of a light blasting body and blocking the blasting hole; and (5) initiating the blasting. The method is mainly applicable for engineering blasting.

Description

technical field [0001] The invention relates to a smooth blasting construction method, in particular to a smooth blasting construction method with front eccentricity and uncoupled charges. Background technique [0002] Traditional smooth blasting generally adopts interval charging, and uses bamboo slices to bind the charge strings at intervals. This charge package structure has uneven charge, resulting in serious local damage in the hole. On the other hand, according to the wave theory, during the propagation of the stress wave, due to the continuous expansion of the geometric volume, the stress pulse decays exponentially. The degree of rock damage in the area is the largest. As the distance between the charge and the hole wall increases, the peak pressure of the stress wave in the surrounding rock also decreases. This is the main feature of the stress field of the upper eccentric uncoupled charging method. The degree of damage is also reduced due to the reduction in peak p...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): F42D1/00F42D3/04F42D1/08F42B33/00
Inventor 韩向红于力李健
Owner CHINA RAILWAY NO 2 ENG GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products