Method for calculating average peak flow rate of paroxysmal mud-rock flow and once total volume of mud-rock flow and application thereof
A peak flow, debris flow technology, applied in the direction of measuring flow/mass flow, liquid/fluid solid measurement, measuring devices, etc., can solve the problem of not being able to provide the average flow, flow time and cut-off time of intermittent debris flow, and inability to accurately determine the time. Problems such as parameters, the difficulty of the formation of debris flow process, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] The total amount of debris flow is calculated at one time.
[0062] like figure 1 , figure 2 shown.
[0063] Calculate the total amount of one-time debris flow of a mud-rock flow that occurred in Dazhaigou, Baihetan, Jinsha River on July 15, 1999.
[0064] Dazhaigou is located in the northwest corner of Qiaojia County, Yunnan Province, on the right bank of Baihetan Canyon on the Jinsha River, and on the west edge of Yaoshan Mountains. It is a first-class tributary on the east bank of the main section of the Jinsha River in northeastern Yunnan. The geographical location of the basin is N27°13′~27°17′; E102°53′~102°57′. The Dazhaigou debris flow is a valley rainstorm type low-frequency super-large viscous patchy debris flow.
[0065] 1. On-site survey and measurement
[0066] The field observation ditch section is selected in the straight and relatively stable ditch section of the Dazhaigou debris flow, with two upper and lower sections, with a distance of 200m. Th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 