Fabricated novel installation process for drain pipe
A prefabricated, new process technology, applied in water supply devices, indoor sanitary piping devices, pipes, etc., can solve the problems of large mutual influence, low work efficiency, and difficult operation, and achieve high quality reliability and high work efficiency. , the effect of less cross-work
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] Embodiment (take the small high-rise installation of 12 floors as an example):
[0034] 1) Reserved holes: When pouring in-situ floors, nail the finished foam embedded parts to the position where the sewer pipe needs to be installed. This is the case every time, and the reserved holes for the installation of the sewer pipe on each floor are on the same vertical line.
[0035] 2) Make the top layer glaze gray anti-seepage sleeve:
[0036] a) First, clean out the embedded parts with reserved holes on the top layer;
[0037] b) Then use the hydraulic ejector pin 1 to hold the reserved hole against the formwork 3 from the next layer, and place the glaze ash anti-seepage sleeve forming mold 2 on the formwork 3, and find the required center position;
[0038] d) After the cement is dampened, build it into the annular gap between the pre-buried hole and the sleeve forming mold 2, and tamp the glaze ash with electric or manual tools;
[0039] e) Take out the sleeve forming di...
PUM