Combined support-excavated geologically solutional deep foundation pit and construction method thereof

A technology of joint support and deep foundation pit, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as inability to carry out excavation construction, difficulty in ensuring normal construction, water inrush or water inrush, etc., and achieve easy control of construction quality. , good sealing effect, good effect

Active Publication Date: 2010-11-24
THE FIRST CIVIL ENG CO LTD OF CREC SHANGHAI GRP
View PDF5 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, under eroded geological conditions, including those with karst caves or fissures, since the excavation depth is often far lower than the normal construction water level, the holes or fissures in eroded geology can easily become channels for groundwater, resulting in water inrush during excavation. Therefore, the slope excavation in the non-support state in the prior art is difficult to guarantee the normal construction. Once the foundation pit support, water stop and other works do not meet the requirements and the foundation pit is affected by the water level or flood, subsequent construction Excavation construction will not be possible

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Combined support-excavated geologically solutional deep foundation pit and construction method thereof
  • Combined support-excavated geologically solutional deep foundation pit and construction method thereof
  • Combined support-excavated geologically solutional deep foundation pit and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] see figure 1 , figure 2 , the foundation pit in the present embodiment is made up of upper grading foundation pit 104 and lower vertical foundation pit 105;

[0030] The upper grading foundation pit 104 forms a two-stage grading surface with a set slope from the surface of the foundation pit;

[0031] The lower vertical foundation pit 105 is supported by reinforced concrete support piles 101 located around the foundation pit; high-pressure jet grouting piles 102 are arranged on the periphery of the reinforced concrete support piles 101, and the area of ​​the high-pressure jet grouting piles 102 is closed by grouting A water-stop curtain 103; an annular crown beam 106 is formed on the pile top of the concrete support pile 101, and at the bottom of the annular crown beam 106, which is located on the inner side wall of the lower vertical foundation pit 105, various reinforced concrete continuous arch rings are sequentially formed 107, until the bottom of the foundation ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a combined support-excavated geologically solutional deep foundation pit and a construction method thereof. The deep foundation pit is characterized by consisting of an upper slope foundation pit and a lower vertical foundation pit; the construction method thereof comprises the steps that: in case of vertical excavation of the deep foundation pit, the periphery of the foundation pit is supported and reinforced by reinforced concrete support piles to prevent the foundation pit from collapse owing to lateral pressure of soil mass; then a high pressure jet grouting pile waterproof curtain is adopted for performing water sealing on soil mass outside the support piles and a bedrock internal grouting curtain is adopted for performing water sealing on geological situations in rocks, such as solution cavity, solution, crack and the like; and in the process of layered excavation, an annular continuous concrete slab wall is adopted for the soil mass and the rocks at the periphery of the foundation pit to form a continuous arch ring lagging. The construction method according to the invention can effectively guarantee the safe, stable, fast and effective excavation of the geologically solutional deep foundation pit.

Description

technical field [0001] The invention relates to a foundation pit in engineering construction and a construction method thereof, in particular to a deep foundation pit in dissolution geology and a construction method thereof. Background technique [0002] In large-scale construction and road and bridge projects, deep foundation pits are the key to ensuring the anchorage construction, and have a great impact on the subsequent construction of catwalks and main cables of the main bridge. The geological conditions in Southwest my country are complex, and most areas are erosive karst landforms, which brings great difficulties to the excavation of deep foundation pits for large-scale buildings, roads and bridges and other projects. [0003] In engineering, a foundation pit with an excavation depth of more than 5 meters is called a deep foundation pit. In the prior art, for deep foundation pits, the slope excavation in the unsupported state is usually adopted, and the support is co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D17/02
Inventor 姚松柏唐俊李飞董燕囡冯海珍周运志李光均王玉林项进张雅平
Owner THE FIRST CIVIL ENG CO LTD OF CREC SHANGHAI GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products