A large-size, thorium-tungsten technology is applied in the field of manufacturing large-size thorium-tungsten billets, which can solve the problems of large crystallites, high-temperature burning loss, and difficulty in uniform particle weight distribution, and achieves reduction of process costs and shortening of the process. , the effect of improving production efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
example 1
[0018] Thorium-doped tungsten powder (tungsten powder doped with thorium oxide powder, 98.0% of tungsten powder and 2.0% of thorium oxide powder by weight) with different particle sizes is used for pressing, and the average particle size is fuss1.56μm. After cold isostatic pressing, the billet is pressed into a billet with a powder content of 2.5kg and a cross-section of Φ18.5-19.5mm. Pre-sintering was carried out under a hydrogen atmosphere at 1350°C. Afterwards, the high-temperature sintering process was adjusted, and the temperature was raised from room temperature to the first holding zone for 1.5 minutes. The current of the first holding zone was 2000A, the holding time was 2 minutes, and the temperature range was 1600-1700°C; Then heat up to the second heat preservation zone in 4 minutes. The current of the second heat preservation zone is 3760A. The heat preservation time is 8 minutes. 4700A, holding time 30min, temperature range 2700~2780℃. After vertical melting, the...
example 2
[0020] Doped thorium tungsten powder with different particle sizes (mixed and dried powder of tungsten powder and thorium nitrate solution, wherein the tungsten powder is 97.0% by weight and thorium nitrate is 3.0%) is used for pressing, and the average particle size is Fisher's particle size fsss1. 62 μm. After cold isostatic pressing, the billet is pressed into a billet with a powder content of 3kg and a cross-section of Φ19.5-20.5mm. Carry out pre-sintering under a hydrogen atmosphere at 1350°C, adjust the high-temperature sintering process, and heat up from room temperature to the first holding zone in 2 minutes. The current in the first holding zone is 2000A, holding time is 2 minutes, and the temperature range is 1500-1650°C; then heat up in 5 minutes To the second heat preservation zone, the current of the second heat preservation zone is 3920A, the heat preservation time is 8min, the temperature range is 2100~2500℃, and then the temperature is raised to the third heat ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Fisherman's average particle size | aaaaa | aaaaa |
| Fisherman's particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More