Dynamic function test method of high-speed train operation control system

A technology for operation control and high-speed trains, applied in general control systems, control/regulation systems, test/monitoring control systems, etc., can solve the problems of high cost of test sequence generation, high cost of test sequence execution, etc., to increase optional range, reduce execution overhead, and reduce the possible effects of misjudgment

Active Publication Date: 2011-06-15
TSINGHUA UNIV +1
View PDF3 Cites 15 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Existing dynamic testing methods mainly have problems such as high test

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Dynamic function test method of high-speed train operation control system
  • Dynamic function test method of high-speed train operation control system
  • Dynamic function test method of high-speed train operation control system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The dynamic testing method of the high-speed train operation control system function that the present invention proposes, its flow chart is as follows figure 2 shown, including the following steps:

[0038] (1) Establish a test model for the function of the high-speed train operation control system: A p = (M, W, B), where,

[0039] M is a finite state automaton constructed according to the functional specifications of the high-speed train operation control system,

[0040] W is the state transition weight vector of the finite state automaton M, which is used to represent the execution cost of the state transition in the dynamic test process, W=[w 1 ,...,w i ,...,w n ], where n is the number of state transitions, w i represents a state transition t i The execution cost of , definition: the execution cost of normal state transition is 1, the execution cost of error state transition is ∞, the initial weight vector of finite state automata M is W=[1,...,1,...,1],

...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a dynamic function test method of a high-speed train operation control system, which belongs to the technical field of high-speed train operation control systems. The method comprises the following steps of: configuring a dynamic test model of a tested high-speed train operation control system based on a parameterization automaton model according to a high-speed train operation control system functional specification; and performing a dynamic test process on the high-speed train operation control system according to the model. In the dynamic test method, a cyclic process consisting of four steps, namely 'generating a test sequence of transfer to be tested', 'executing the test sequence', 'analyzing a test result' and 'updating a dynamic test model parameter' is performed. By the method, the generation of a fixed test sequence set before the high-speed train operation control system is tested is avoided, and the problems of low test coverage rate and low test result accuracy of the conventional static test method as well as high generation cost and high execution cost of a test sequence in the conventional dynamic test method are solved.

Description

technical field [0001] The invention relates to a dynamic test method for the function of a high-speed train operation control system, belonging to the technical field of high-speed train operation control systems. Background technique [0002] The main purpose of the high-speed train operation control system function test is to verify whether the tested high-speed train operation control system conforms to the system function specification. The traditional functional testing of high-speed train operation control systems is mainly based on static testing methods. During testing, problems such as low test coverage and low accuracy of test results have been encountered. Aiming at the problems of static testing methods, some scholars in the field of protocol conformance testing The dynamic test method was first proposed. The dynamic test method generates a larger set of test sequences to be selected before the test is executed. During the test execution, the next test sequence ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G05B23/00
Inventor 吉吟东王帅周暐孙新亚董炜
Owner TSINGHUA UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products