A system debugging method for UHV DC transmission engineering station

A technology of ultra-high voltage direct current and debugging method, which is applied in the direction of measuring electricity, measuring electrical variables, measuring devices, etc., and can solve problems such as system complexity.

Active Publication Date: 2011-12-14
CHINA ELECTRIC POWER RES INST +1
View PDF3 Cites 26 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the large number of UHV DC transmission system equipment and the complexity of the system, before the end-to-end transmission and commissioning of the system, the UHV DC engineering station system must be debugged, and the reliability of each converter station equipment must be tested by means of live main equipment

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A system debugging method for UHV DC transmission engineering station
  • A system debugging method for UHV DC transmission engineering station
  • A system debugging method for UHV DC transmission engineering station

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0085] The present invention will be further described below in conjunction with the accompanying drawings.

[0086] The purpose of UHV engineering station system commissioning is to inspect the performance of converter station equipment and DC lines in accordance with the requirements of the engineering contract and technical specifications, including calculation, sequential operation test, final trip test, converter bus charging and power outage Test, AC filter bank and capacitor bank charging and power-off test, converter transformer with converter switching and live test, open circuit test and secondary equipment anti-interference test.

[0087] (1) Steps

[0088] The system commissioning of the UHV DC transmission project station includes the following steps: (1) system calculation and analysis; (2) formulation of relevant commissioning schemes; (3) on-site commissioning implementation of the actual system; (4) commissioning summary.

[0089] (1) System calculation analy...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an ultra high voltage direct current (UHVDC) transmission engineering station system debugging method. Through carrying out calculating, a sequential operation test, a last trip test, a commutation bus charging and power outage test, an alternating current filter group and capacitor group charging and power outage test, a test of switching performed by a converter transformer instead of a converter and a charged test, an open circuit test and a secondary equipment anti-interference test to the engineering station, station system debugging steps of the UHVDC transmission engineering are clearly provided, work tasks and test projects in each stage are provided and the test projects are arranged scientifically and reasonably. Simultaneously, test contents of each kind of the test projects are provided in the invention. Calculation and research are performed to various kinds of converter station system debugging operation modes based on fully investigation of the equipment and the system. By using an extra-high-voltage change-rheological station debugging scheme, instructiveness and operability of the debugging scheme to engineering enforcement can be greatly raised, test projects listed in the debugging scheme can be guaranteed to be complete, a test sequence is clear and a test mode is safe.

Description

Technical field: [0001] The invention relates to the field of high-voltage direct current transmission, in particular to a system debugging method for an ultra-high voltage direct current transmission engineering station. Background technique: [0002] In today's society, the UHV DC transmission system has many advantages in high-power long-distance transmission and asynchronous networking, such as: strong transmission capacity, high transmission efficiency, long transmission distance, large transmission capacity, flexible control and convenient scheduling. Therefore, the application of UHVDC transmission system is becoming more and more extensive. Its project has become the focus of investment and operation. However, due to the large number of UHV DC transmission system equipment and the complexity of the system, before the end-to-end transmission and commissioning of the system, the UHV DC engineering station system must be debugged, and the reliability of each converter ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/00
Inventor 刘云曾南超杨万开王华伟印永华
Owner CHINA ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products