A non-destructive testing system for channel concrete lining

A non-destructive testing and concrete technology, which is applied in radio wave measurement system, measurement device, radio wave reflection/reradiation, etc., can solve the problems affecting the stability of lining layer, the effect of anti-seepage and slope protection, and the safety of levee, so as to improve the efficiency and the effect on accuracy

CN102288625AInactive Publication Date: 2011-12-21李典基
6 Cites 33 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2011-12-21
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a channel concrete lining non-destructive testing system, which includes a computer, and is characterized in that: the computer is connected to a dedicated ground-penetrating radar subsystem, and the computer includes a radar data processing subsystem and an ultrasonic data processing subsystem, and the radar The data processing subsystem includes a file management module, a profile data processing module, a lining disease simulation analysis module, a layer tracking and disease identification module, and a lining physical property analysis module. The ultrasonic data processing subsystem includes an ultrasonic wave velocity calculation module and a coagulation intensity Judgment module. This system improves the data processing efficiency and accuracy of the construction quality inspection of canal concrete lining, and provides scientific, accurate, advanced and effective technical support for the construction quality inspection of canal concrete lining.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of non-destructive detection of channel concrete lining, in particular to a non-destructive detection system of channel concrete lining. Background technique

[0002] The total investment of the south-to-north water diversion project is expected to be 500 billion yuan, and the investment in trunk line construction during the "Tenth Five-Year Plan" period will be 40-45 billion yuan. The construction plan of the South-to-North Water Diversion Project has a total length of nearly 1800km on the east line and a total length of 1420km on the main canal of the middle line project. The total length of the Jiping main canal and the Jiaodong water supply main canal on the eastern route of the South-to-North Water Diversion Project, which has already started, is more than 700 kilometers. There are also thousands of kilometers of canals that need to be lined for other large-scale water diversion projects such as the Xinjiang Nort...

Examples

Embodiment Construction

[0034] The present invention will be further described in detail below in conjunction with the accompanying drawings and preferred embodiments.

[0035] see figure 1 - Figure 17 , including a computer, the computer is connected to a dedicated ground-penetrating radar subsystem, the computer includes a radar data processing subsystem and an ultrasonic data processing subsystem, and the radar data processing subsystem includes a file management module, a profile data processing module, and a lining disease processing module. The simulation analysis module, layer tracking and disease identification module, and lining physical property analysis module, the ultrasonic data processing subsystem is used to complete the calculation of ultrasonic wave velocity and the determination of coagulation strength.

[0036] A radar host and a radar antenna module connected thereto, the radar host includes a control circuit and a start pulse circuit connected thereto, the control circuit is al...