Full-pile casing construction device
A technology of construction device and full protective tube, which is applied in basic structure engineering, construction, sheet pile wall, etc., can solve the problems of low construction efficiency, high construction cost, and no lifting and protective tube.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The core of the present invention is to provide a construction device for the full casing construction method, which is used as a special equipment for pressing down and pulling out the casing, which has sufficient downforce and pulling force, and has high construction efficiency and low production efficiency. cost.
[0038] In order to enable those skilled in the art to better understand the technical solutions of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0039] Please refer to figure 1 , figure 1 It is a schematic structural diagram of the construction device of the full-casing construction method provided by the present invention.
[0040] The present invention provides a full-casing construction method construction device, which includes soil-borrowing equipment 1 and pipe-scraping drilling rig 2, wherein the pipe-scraping drilling rig 2 is instal...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 