Vacuum preloading consolidation method for duplex vacuum tube well of blowing filling soft soil
A vacuum tube well and vacuum tube technology, applied in soil protection, construction, infrastructure engineering and other directions, can solve the problems of insignificant reinforcement effect, low transfer efficiency, and difficult drainage, etc., to improve the reinforcement effect, make it easier to discharge, and improve the transfer efficiency. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] refer to figure 1 and figure 2 , a composite vacuum tube well vacuum preload reinforcement method for filling soft soil, using a composite vacuum tube well, the composite vacuum tube well includes an inner tube 7, an outer tube 4 and a filter membrane 2, the lower end of the outer tube 4 is closed, and the The upper end of the outer tube 4 is provided with a sealing head, and the inner tube passes through the sealing head and extends into the bottom of the inner cavity of the outer tube. The outer wall of the middle and lower part of the outer tube is covered with the filter membrane, and the tube wall of the outer tube where the filter membrane is located has a water-permeable hole; the inner tube is directly connected to the vacuum system, and the water in the outer tube is pumped away and a negative pressure is generated in the outer tube , in the early stage of reinforcement, intermittently turn on the vacuum pump to pump water, and reduce the water content of the...
Embodiment 2
[0047] refer to image 3 and Figure 4 , In the present embodiment, the mud is blown and filled first, and then the vacuuming equipment is set. At this time use image 3 In the shown soft composite vacuum tube well, the outer tube 4 is a corrugated filter tube with a diameter of 5 cm, and the inner tube 7 adopts a spring plastic hose with a diameter of 2 cm or a plastic hose that can be vacuumed. See layout diagram Figure 4 , the main implementation technical steps are as follows:
[0048] (1) Build the cofferdam first, then blow fill the soft soil in the cofferdam, and install the double vacuum corrugated filter pipe after the soft soil has settled down to a certain level due to its own weight.
[0049] (2) Connect the vacuum hose of the compound vacuum corrugated filter tube to the vacuum system.
[0050] (3) Complete the laying of geotextile and sealing membrane.
[0051] (4) The vacuum pump is turned on intermittently before vacuuming, the main purpose is to extract...