Large-scale overhauling method of high-voltage electrical equipment

A high-voltage electrical equipment, large-scale technology, applied in the direction of electrical components, switchgear, etc., can solve problems such as poor process connection, low operating efficiency, and extensive management forms, so as to achieve controllable operating risks, improve operating efficiency, and shorten operating time. the effect of time

Inactive Publication Date: 2012-06-13
NANYANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER
View PDF1 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the large-scale technical renovation and maintenance projects of substations, there are often problems such as large construction period span, many tasks, many work areas, many on-site personnel and vehicles, and many cross-operations. On-site construction safety risk management and construction quality control also encounter difficulties to varying degrees
In the past, in the maintenance work of high-voltage electrical equipment, there was no systematic organization method that carried out pilot projects first and carried out comprehensively. Instead, it blossomed everywhere at one time. It was difficult to formulate a relatively complete treatment method for various problems that occurred during maintenance, and the management form was relatively extensive.
At the substation equipment maintenance site, the working area has not been functionally divided scientifically, resulting in poor connection between processes; due to the limitation of the number of people working at heights, most of the ground workers cannot fully play their roles, and the workers at heights are restricted by vehicles. Fast flow, lack of modern handling equipment at the maintenance site, and low efficiency; in addition, the operators do not subdivide the operation procedures during the equipment maintenance, and the maintenance personnel often work from the beginning to the end. Due to the different mastery of the entire process, the entire maintenance operation is affected time, the overhaul site has chaotic management, low operating efficiency, sharply increased pressure on safety risk control, and uneven operating quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] Below by specific embodiment, further illustrate the present invention:

[0014] First select one or a group of equipment that needs large-scale maintenance in substations, and carry out pilot maintenance operations. First, carry out basic operations that can be carried out before power outages, and then scientifically divide the functions of the equipment maintenance work area, and then conduct maintenance work The process of equipment is subdivided, the whole maintenance process is divided into several process combinations according to the process, the construction team that executes the process combination is determined, and the backbone personnel for large-scale maintenance are trained through pilot maintenance operations. Each person only needs to master a few processes, eliminating the need to use Obstacles of self-propelled lifting vehicles and forklifts, evaluate and rectify the division and connection between various operating functional areas; transport mainten...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a large-scale overhauling method of high-voltage electrical equipment. Operation procedures are subdivided through scientifically dividing functions of an equipment overhauling operation region by using an organization method of trial guide and then complete spreading; and a working-at-height mobile platform is constructed by applying a modern operation device, and the site factorized equipment overhauling method of an assembly line is formed on a transformer substation overhauling site. Through implementing the method, the layout of the traditional disordered transformer substation construction site is changed, and an original overhauling mode of operating from the beginning to the end is changed, thus an operator more skillfully operates and controls the procedures. By means of the modern operation device, mechanization operation is widely developed, thus the site safety management and control level is improved, the operation time is effectively shortened, and the overhauling quality is improved.

Description

technical field [0001] The invention belongs to the technical field of high-voltage equipment maintenance, and in particular relates to a large-scale maintenance method for high-voltage electrical equipment. Background technique [0002] With the rapid construction and development of the power grid, due to the natural aging of electrical equipment and the upgrading of the power grid, many high-voltage electrical equipment need to be overhauled after reaching a certain operating life. There are mainly electrical equipment such as high-voltage circuit breakers, disconnectors, and current transformers. In the large-scale technical renovation and maintenance projects of substations, there are often problems such as large construction period span, many tasks, many work areas, many on-site personnel and vehicles, and many cross-operations. On-site construction safety risk management and construction quality control also encounter difficulties to varying degrees . In the past, in...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02B3/00
Inventor 王岩余晓东曲欣王超井子恒
Owner NANYANG POWER SUPPLY COMPANY OF STATE GRID HENAN ELECTRIC POWER
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More