Line loading and unloading equipment for delivery port
A loading and unloading equipment and flowing water technology, which is applied in the directions of loading/unloading, transportation and packaging, etc., can solve the problems of high labor intensity and long waiting time for forklifts, reduce labor intensity, save time waiting for forklifts, and improve delivery efficiency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] In January 2012, the flow-through loading and unloading equipment at the delivery port designed by the inventor was used in the finished product warehouse of the first feed workshop. There are two groups of moving backing plates, track 3, barcode scanning area 4, flat conveyor belt 5 and lifting conveyor belt 6 designed on the delivery port of the finished product warehouse. The angle between them is an inclined backing plate 1 of 20° and a plane backing plate 2 capable of placing goods 7. The inclined backing plate 1 is placed on the track 3 by the sliding wheels 13 on the bottom surface. When delivering goods, the driver of the forklift puts the goods 7 on the first group of movable backing plates, and the operator pushes the moving backing plates along the track 3 to the entrance of the flat conveyor belt 5, and pushes the goods 7 on the moving backing plates to the On the flat conveyor belt 5, the goods 7 advance along with the flat conveyor belt 5, and pass through...
Embodiment 2
[0034] In February 2012, the flow-through loading and unloading equipment at the delivery port designed by the inventor was used in the finished product warehouse of the No. 2 Feed Workshop. There are three sets of moving pads, track 3, barcode scanning area 4, flat conveyor belt 5 and lifting conveyor belt 6 designed on the delivery port of the finished product warehouse. Angle is 25 ° inclined backing plate 1 and the plane backing plate 2 that can place goods 7, and inclined backing plate 1 is placed on the track 3 by the sliding wheel 13 of bottom surface. After trial, it not only saves the time of waiting for forklifts, but also increases the daily delivery volume from 1,600 tons to 1,900 tons. In order to track the quality of each piece of goods sent out, and, after using it for 3 months, there has been no error in the delivery and purchase operations.
Embodiment 3
[0036]In February 2012, the flow-through loading and unloading equipment at the delivery port designed by the inventor was used in the finished product warehouse of the No. 3 Feed Workshop. There are four sets of moving pads, track 3, barcode scanning area 4, flat conveyor belt 5 and lifting conveyor belt 6 designed on the delivery port of the finished product warehouse. The inclined backing plate 1 with an included angle of 30° and the plane backing plate 2 capable of placing goods 7, the inclined backing plate 1 is placed on the track 3 through the sliding wheels 13 on the bottom surface. After 3 months of use, it not only saves the time of waiting for forklifts, but also improves the loading efficiency rapidly. The highest daily delivery volume in April was 2,200 tons, and the delivery port of the finished product warehouse has reduced two operators compared with the original one.