Mal-position assembly in-position method of truss bridge

A technology for truss beams and bridges, which is applied to the field of truss beams assembled and in place at different positions, can solve the problems that truss beams are difficult to assemble in one step, difficult to transport in place on site, and difficult to assemble truss beams, and achieves high assembly efficiency and operation. Simple, fast results

Active Publication Date: 2015-03-11
CHINA RAILWAY 23RD CONSTR BUREAU LTD +1
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

These two methods have high requirements on the terrain. When the environmental conditions of the project site are harsh, the terrain is complex, and the bridge type is curved, sloped, or inclined, it is difficult to achieve a flat site for assembling the truss beam near the bridge span, and it is also difficult to assemble the truss beam on the site. It is often difficult to assemble the truss girders in one step during the erection process, and the existing technology is difficult to meet the construction of high-pier truss girders under the complex terrain conditions in mountainous areas.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Mal-position assembly in-position method of truss bridge
  • Mal-position assembly in-position method of truss bridge
  • Mal-position assembly in-position method of truss bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The present invention will be further described in detail below in conjunction with test examples and specific embodiments. However, it should not be understood that the scope of the above subject matter of the present invention is limited to the following embodiments, and all technologies realized based on the content of the present invention belong to the scope of the present invention.

[0028] Such as Figure 1-5 As shown, the truss girder assembling in place method for curved bridges is characterized in that it includes the following steps:

[0029] Step 1. Build the assembly platform 101, excavate the subgrade at the abutment to form a working platform or set up a steel pipe support platform in the middle of the bridge, the working platform or support platform is the same height as the pier 2, and a truss beam is arranged in the middle of the working platform or support platform Assembled platform 101; In order to be more conducive to the assembling of truss gird...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates a mal-position assembly in-position method of a truss bridge. The method comprises the steps of building an assembly platform: excavating a roadway at a bridge abutment to form a work platform or erecting a steel tube bracket platform in the middle of a bridge, and arranging a girder assembling platform in the middle of a work platform or a bracket platform; firstly assembling the truss bridge: firstly assembling the truss bridge on an assembly platform, longitudinally moving the truss bridge to empty the space of the assembly platform part; assembling the truss bridge for the second time, the longitudinally moving the truss bridge to empty the space of the assembly platform part; repeating the steps to assemble the truss bride for the third time, the fourth time and the like and putting the truss bridge in position, taking width of the assembly platform as the limit, rotating the whole truss bridge by an angle to be in position, or longitudinally positioning or horizontally positioning. According to the mal-position method of the truss bridge, the technical difficulty that the truss bridge is difficult to be in position by one step when a high-pier truss bridge is erected at a complex terrain area, the operation is simple and convenient, the truss bridge assembling efficiency is high, and the alignment is accurate.

Description

technical field [0001] The invention relates to a bridge installation method, in particular to a method for assembling and placing truss girders of curved bridges in different positions. Background technique [0002] At present, in bridge engineering, the out-of-position assembly of truss girders is generally carried out by direct hoisting in place. The specific method is to level the site near the installation span as an assembly platform, and place the main beams to be hoisted on the assembly platform. After the beam assembly is completed, two cranes are used for direct hoisting, or after the out-of-position assembly is completed, it is transported to the site for direct hoisting. These two methods have high requirements on the terrain. When the environmental conditions of the project site are harsh, the terrain is complex, and the bridge type is curved, sloped, or inclined, it is difficult to achieve a flat site for assembling the truss beam near the bridge span, and it i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 李治强彭继安陈幼林杨毅刘延龙王岑申瑞烂巨建基徐仁华杨肃钟张晓飞张旭董凤杰周川岭樊建国蒋自强吴星银李文芳
Owner CHINA RAILWAY 23RD CONSTR BUREAU LTD