Hoisting construction method for single-rib closure rope of large-span reinforced concrete arch bridge
A technology of reinforced concrete and construction methods, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve problems such as high construction costs, numerous equipment, and complicated procedures, and achieve reduced construction costs, less construction volume, and reduced construction height effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] combined with Figures 1 to 4 The embodiment of the present invention is described further:
[0030] Before carrying out single-rib closing-long cable hoisting construction, it is necessary to determine the horizontal span of the arch rib, the height of the tower, the maximum hoisting weight, and the type of anchor in combination with the topography of the bridge site, landform and construction period. This embodiment is a single-span, single-piece arch rib, and the arch rib is a symmetrical 7-segment structure, including: an end segment, a middle segment, a middle segment, and a vault segment.
[0031] After the above preparatory work is completed, it will enter the single-rib closing-long cable hoisting construction stage, and the steps are as follows:
[0032] (1) Build towers on the local bank and the opposite bank respectively. The towers built on the local bank are the local towers, and the towers built on the opposite bank are the opposite bank towers. The local...
Embodiment 2
[0054] In this embodiment, the arch ribs are composed of four parallel pieces, and each arch rib is a symmetrical seven-section structure, including: an end section, a middle section, a middle two section, and a vault top section.
[0055] After the above preparatory work is completed, it will enter the single-rib closing-long cable hoisting construction stage, and the steps are as follows:
[0056](1) Build towers on the local bank and the opposite bank respectively. The towers built on the local bank are the local towers, and the towers built on the opposite bank are the opposite bank towers. The local towers are set on the pier tops of the junction piers of the local bank , the tower on the opposite bank is arranged on the top of the junction pier on the opposite bank, and the bottoms of the tower on the local bank and the tower on the opposite bank are hinged with the junction piers below them respectively, and the junction piers under the tower on the local bank and the to...
Embodiment 3
[0078] The arch ribs in this embodiment have two spans, both of which are single arch ribs, and each arch rib is a symmetrical seven-segment structure, including: an end segment, a middle segment, a middle segment, and a vault segment.
[0079] After the above preparatory work is completed, it will enter the single-rib closing-long cable hoisting construction stage, and the steps are as follows:
[0080] (1) Build towers on the local bank and the opposite bank respectively. The towers built on the local bank are the local towers, and the towers built on the opposite bank are the opposite bank towers. The local towers are set on the pier tops of the junction piers of the local bank , the tower on the opposite bank is arranged on the top of the junction pier on the opposite bank, and the bottoms of the tower on the local bank and the tower on the opposite bank are hinged with the junction piers below them respectively, and the junction piers under the tower on the local bank and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com