Construction method in which large-diameter shield advances across air shaft in long distance
A construction method and long-distance technology, applied in the direction of earth cube drilling, mining equipment, tunnels, etc., can solve problems such as segment deformation, and achieve the effects of solving deformation, saving maintenance time, saving construction period and materials
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] Below in conjunction with specific embodiment, further illustrate the present invention. It should be understood that these examples are only used to illustrate the present invention and are not intended to limit the scope of the present invention. In addition, it should be understood that after reading the teachings of the present invention, those skilled in the art can make various changes or modifications to the present invention, and these equivalent forms also fall within the scope defined by the appended claims of the present application.
[0020] The present invention is a construction technology for long-distance traversal of shield tunneling in the 5th bid project of Shanghai Rail Transit Line 16, and the tunnel to be constructed ( figure 1 , shown in 2), the specific implementation steps are:
[0021] 1) Determine the shield axis when passing through the wind shaft
[0022] When the shield tunnel passes through the wind shaft, the design plane axis of the e...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com