A construction method and technology of medium and small spans, applied in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problems of many construction procedures, low construction efficiency, long construction period, etc., to ensure construction safety and shorten construction period. , the effect of saving construction costs

Active Publication Date: 2016-01-20
镇江建工建设集团有限公司
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing construction method has many construction procedures and a long construction period. The erection error of the bracket and the formwork will affect the construction quality. The construction quality is greatly affected by environmental factors such as temperature and humidity on the construction site. The shrinkage and creep effect of the concrete poured on site is obvious. The construction quality is not easy to control and the construction efficiency is not high
Invention patent ZL02137151.2 discloses a construction method for longitudinal assembly of prefabricated sections of channel girders. The construction method is to divide the channel girders into sections of channel girders along the bridge direction with horizontal vertical joints, prefabricate them in sections, and then Assemble the prefabricated segmental channel beams, and then stretch the longitudinal prestressed tendons to form the main structure of the channel beams. The advantage of this invention patent is that the prefabricated segmental channel beams are used, which avoids the disadvantages of the cast-in-place method. Defects, however, this invention patent is only applicable to trough girder bridges using longitudinal prestressed tendons. For small and medium-span trough girder bridges, ordinary steel bars can meet the requirements of stress and deformation without using longitudinal prestressed steel bars. Therefore, the construction method of this invention patent will not be able to be used for construction of small and medium span trough bridges

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method of Small and Medium Span Channel Girder Bridge
  • A Construction Method of Small and Medium Span Channel Girder Bridge
  • A Construction Method of Small and Medium Span Channel Girder Bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] The present invention will be further described below in conjunction with accompanying drawing.

[0018] like figure 1 As shown, a construction method of a small and medium-span trough girder bridge first divides the trough girder bridge into three components along the longitudinal vertical joints, and these three components are the integral component 1 of the left longitudinal girder and the left web, Floor member 2, integral member 3 of right longitudinal beam and right web. The above three components are prefabricated at the prefabricated site while the bridge substructure is poured on site.

[0019] The work of prefabricated components includes making brackets and templates in place, making and installing steel skeletons, reserving hoisting buckles and transverse steel joints, pouring concrete and performing maintenance.

[0020] At the bottom of prefabricated component 1 and component 3, the transverse reinforcement joints are reserved according to the design spe...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for a medium and small span trough girder bridge. The method comprises the following steps: dividing a trough girder body into three members, which are an integral member of a left longitudinal girder and a left web plate, a bottom plate member and an integral member of a right longitudinal girder and a right web plate respectively, along a longitudinal vertical slit; casting in place on a substructure of the bridge and simultaneously prefabricating the three members on a prefabrication site; reserving a transverse reinforcement joint at the bottom of the prefabricated member and reserving transverse reinforcement joints on the left and right sides of the bottom plate; conveying the prefabricated members to the construction site after the construction and maintaining of the substructure are finished, lifting to a specific location by lifting equipment, arranging longitudinal reinforcements on site, binding, lapping or welding with the reserved transverse reinforcement joints, then pouring concrete at a joint section and performing construction and maintaining of the concrete at the joint section to form a body structure of the trough girder bridge. According to the construction method, the defects existing in the prior art are overcome, the construction processes can be simplified by prefabricating the members on the prefabrication site, the construction progress is quickened, the construction efficiency is improved, and the construction cost is reduced.

Description

technical field [0001] The invention belongs to the technical field of civil engineering, and relates to a bridge construction method, in particular to a construction method of a small and medium-span trough beam bridge. Background technique [0002] The construction of existing trough girder bridges mainly adopts the construction method of in-situ pouring (or "cast-in-place" for short). In this construction method, after the pouring and maintenance of the lower structure of the bridge is completed, the upper structure is poured. The main processes include: Erection of brackets and formwork at the construction site, bending of steel bars and welding of joints, welding, installation and fixing of steel skeletons, concrete mixing, transportation, pouring, vibration, maintenance, and formwork removal, support removal, etc. The existing construction method has many construction procedures and a long construction period. The erection error of the bracket and the formwork will aff...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/00
Inventor 周道传董作超潘志宏
Owner 镇江建工建设集团有限公司