A construction method and pile foundation technology, applied in sheet pile wall, foundation structure engineering, construction and other directions, can solve the problems of public facilities not meeting the needs of use, wasting manpower and material resources, delaying the construction progress, etc. Safe and reliable use, low construction site requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0019] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0020] As shown in the figure: in a kind of construction method of extracting piles of the present invention, tripod 1, pipe drill head 2, drill pipe 3, old pile foundation 4, movable pulley 5, angle steel ground pile 6, wire rope cover 7, forklift 8.
[0021] A construction method for extracting piles of the present invention comprises the following steps:
[0022] A. Preparations before pulling piles:
[0023] Select the tonnage of forklift 8 according to the weight of old pile foundation 4, forklift 8 is arranged on old pile foundation 4 limits; Seam steel pipe is made, and its wall thickness and height are decided according to the depth of the old foundation pile 4 that prepares to pull out, and tripod 1 is provided with base, and described base is fixed with ground by expansion bolt. The movable pulley 5 is installed at the center of the tripod 1, the ...