Sampling-based park-and-ride facility attraction demand quantitative classification calculation method
A calculation method and demand technology, applied in the direction of calculation, data processing application, forecasting, etc., can solve the problem of the size and intensity distribution of the demand for facilities without quantitative analysis
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051] The Tiantongyuan North Park-and-Ride facility in Beijing was selected, and the quantitative calculation method of the demand-attracting range of the Park-and-ride facility was applied. Based on the survey sample, the calculation of the attraction demand density of the Tiantongyuan North Park-and-ride facility was carried out, and the facility demand attraction was carried out. Grading of scope requirement strength.
[0052] Tiantongyuan North Park-and-Ride Facility is the terminal station of Metro Line 5. It is located between the North Fifth Ring Road and the North Sixth Ring Road. The straight-line distance from the city center is about 20km. It was officially put into use in October 2007. There are 438 parking lots, and the utilization rate of the parking lot is relatively high. It is a park-and-ride facility connected to the subway and bus. The main transfer mode for car travelers after parking is the subway.
[0053] Using the revealed preference (RP) method, a que...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com