Unlock instant, AI-driven research and patent intelligence for your innovation.

Grid management system and management method for high-speed railway fixed equipment

A fixed equipment, high-speed railway technology, applied in data processing applications, electrical digital data processing, special data processing applications, etc., can solve the deterioration of high-speed railway running fixed equipment, not suitable for high-speed railway maintenance needs, lack of depth of equipment state change rules analysis, etc.

Active Publication Date: 2016-12-28
BEIJING JIAOTONG UNIV +1
View PDF1 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] 2) Deterioration characteristics of high-speed railway fixed equipment
[0024] 2) The three majors independently construct the public works management information system, electric power management information system and traction power supply management information system. Their main features are to realize the digitization of daily business activities such as equipment data collection and statistical reports in the operation phase, and lack of equipment status changes. Regular in-depth analysis
[0037] Due to the high repair standards, high stability and high reliability requirements of high-speed railways, as well as the technical characteristics of high linkage between equipment, the traditional maintenance mode is no longer suitable for the maintenance needs of high-speed railways, and a multi-specialty centralized maintenance mode is required

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Grid management system and management method for high-speed railway fixed equipment
  • Grid management system and management method for high-speed railway fixed equipment
  • Grid management system and management method for high-speed railway fixed equipment

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0095] The present invention will be described in detail below in conjunction with accompanying drawing, one object of the present invention is to provide a kind of high-speed railway grid management information system, such as figure 1 Shown is the schematic diagram of the composition and structure of the high-speed railway grid management information system. The invention mainly includes five parts: hardware environment, software environment, data acquisition module, data storage management and application system.

[0096] 1) Hardware environment

[0097] The system hardware environment includes three parts: network environment, server end and client end.

[0098] a) The network environment is the railway office network;

[0099] b) Server-side hardware includes database servers, application servers and disk arrays;

[0100] c) The client hardware is a PC or tablet connected to the railway office network.

[0101] 2) Software environment

[0102] The system software env...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a high-speed railway fixed equipment grid management system and management method, mainly to build a high-speed railway fixed equipment grid on the basis of existing professional management information systems such as engineering, electricity, and traction power supply. The management system divides the high-speed railway lines into several grid units according to certain standards, and uses modern information technology and coordination mechanisms to conduct equipment status perception more thoroughly and in a timely manner, and realize more comprehensive equipment status information interconnection and smarter Make equipment repair decisions to ultimately ensure operational safety, scientifically control operational risks, integrate maintenance resources, reduce maintenance costs, and improve management efficiency.

Description

technical field [0001] The invention relates to railway equipment management, in particular to a grid management system and management method for high-speed railway fixed equipment. Background technique [0002] (1) Characteristics of high-speed railway fixed equipment [0003] 1) Technical characteristics of high-speed railway fixed equipment [0004] High-speed railway fixed equipment mainly refers to public works equipment, electrical equipment, and traction power supply equipment. These devices are the basis of the entire high-speed rail technology system. Their common feature is that the spatial location is fixed, integrated with the surrounding geographical environment, most of them are customized, and the change of state is inseparable from the geographical environment. [0005] (A) Significantly improved equipment intelligence [0006] The design and manufacture of high-speed railway fixed equipment involves the latest technological achievements in various discip...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F17/00G06Q10/06
Inventor 刘仍奎王峰王福田张骏孙全欣徐伟昌白磊唐源洁
Owner BEIJING JIAOTONG UNIV