Construction Method of Diaphragm Wall Meeting Underground Pipeline
A technology of underground pipelines and construction methods, which is applied in the field of construction, can solve the problems that the enclosure structure cannot be normally constructed and enlarged, and achieve the effect of saving relocation costs and ensuring the construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0016] The present invention will be further described below in conjunction with the accompanying drawings.
[0017] One of the present invention's reverse construction method for diaphragm wall meets underground pipeline is: please refer to the plan image 3 , also known as the top view, which shows that when the diaphragm wall meets the underground pipeline and the pipeline is difficult to relocate, in order to ensure the construction period, the diaphragm wall within the scope of the pipeline is designed in the form of reverse design. First, according to the plane position of the pipeline 1 and the relationship between the pipeline 1 and the enclosure structure, determine the width of the reverse diaphragm wall 2 . After the range of the reversed diaphragm wall 2 is determined, adjust the wall width of the adjacent normal segmented diaphragm wall 3, and the adjacent diaphragm wall adopts the section steel joint 7; 3 Next, build two rows of Φ800600 double-tube high-pressure...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com