Method for washing out rocks in soil and/or construction waste surface chlorinated nitrobenzene pollution with anion/nonionic mixed surfactant
A technology of surfactant and construction waste, applied in the field of soil pollution treatment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0023] Select an actual chlorinated nitrobenzene-contaminated site to pollute the soil, carry out physical screening on the polluted soil, and separate the larger stones and construction waste. Prepare 2L of sodium dodecylbenzenesulfonate aqueous solution with a concentration of 8g / L, prepare 2L of Tween-80 aqueous solution with a concentration of 12g / L, and put it in a 5L glass reaction vessel according to the volume ratio : Tween-80 aqueous solution=1:1 ratio mixing two kinds of surfactant solutions. Weigh 1Kg of separated stones and construction waste (i.e. 0.25Kg / L mixed surfactant solution) and put it into the reaction container, and mix the stones and construction waste with the mixed surfactant solution fully by stirring, and after fully contacting and reacting for 1 day , let the reaction suspension stand still, and discharge the upper aqueous solution after the stones and construction waste completely sink to the bottom layer. The removal rate of chlorinated nitroben...
Embodiment 2
[0025]Select an actual chlorinated nitrobenzene-contaminated site to pollute the soil, carry out physical screening on the polluted soil, and separate the larger stones and construction waste. Prepare 2L of sodium dodecylbenzenesulfonate aqueous solution with a concentration of 12g / L, prepare 2.4L of Tween-80 aqueous solution with a concentration of 8g / L, and put it in a 5L glass reaction vessel according to the volume ratio of sodium dodecylbenzenesulfonate Aqueous solution: Tween-80 aqueous solution = 1:1.2 ratio mixing two surfactant solutions. Weigh 2.2Kg of separated stones and construction waste (i.e. 0.5Kg / L mixed surfactant solution) into the reaction vessel, and mix the stones and construction waste with the mixed surfactant solution by stirring to fully contact the reaction 3 After one day, let the reaction suspension stand still, and discharge the upper aqueous solution after the stones and construction waste completely sink to the bottom layer. The removal rate of...
Embodiment 3
[0027] Select the actual chlorinated nitrobenzene contaminated soil in a certain place, conduct physical screening on the contaminated soil, and separate the larger construction waste. Prepare 2L of sodium dodecylbenzenesulfonate aqueous solution with a concentration of 10g / L, prepare 1.6L of Tween-80 aqueous solution with a concentration of 10g / L, and put it in a 5L glass reaction vessel according to the volume ratio of sodium dodecylbenzenesulfonate Aqueous solution: Tween-80 aqueous solution=1:0.8 ratio mixing two kinds of surfactant solutions. Take by weighing 1.44Kg isolated construction waste (i.e. 0.4Kg / L mixed surfactant solution) and put it into the reaction vessel, make the construction waste and mixed surfactant solution fully mix by shaking, after fully contacting and reacting for 2 days, let the reaction suspend Turbid liquid, after the construction waste completely sinks to the bottom layer, discharge the upper layer aqueous solution. The removal rate of chlorin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More