Recursive flow process construction method for ultra-long concrete floor structure

A construction method, concrete technology, applied in the direction of building construction, building material processing, construction, etc., to achieve the effect of reducing cracking

Active Publication Date: 2014-03-26
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF5 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this recursive flow construction method is only for general single concrete structures. For super-long concrete floor structures, the ordinary recursive flow construction method cannot solve the problem of the binding force between the concrete floor and the concrete beam.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Recursive flow process construction method for ultra-long concrete floor structure
  • Recursive flow process construction method for ultra-long concrete floor structure
  • Recursive flow process construction method for ultra-long concrete floor structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0038] Cooperate with reference figure 1 as well as figure 2 As shown, the present invention provides a recursive construction method for an ultra-long concrete floor structure. The ultra-long concrete floor structure 1 includes a concrete floor 10 and a plurality of concrete beams that are vertically arranged below the concrete floor 10 20. The concrete floor 10 is separated by concrete beams 20 to form a plurality of warehouses 30. The recursive flow construction method of the super-long concrete floor structure includes the following steps:

[0039] S101 First, determine the construction period...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a recursive flow process construction method for an ultra-long concrete floor structure. The method includes the following steps that the ultra-long concrete floor structure is partitioned; maximum tension stress and maximum shear stress of a concrete beam on a concrete floor in each bay are calculated, and the mixing proportion of concrete is adjusted; the recursive flow process construction direction of the overall concrete floor is determined; the pouring time interval between every two adjacent concrete floors is calculated; the rate of maximum hydration heat temperature raising and temperature lowering in the concrete beam and the concrete floor is determined; it is guaranteed that the maximum axial force applied to the concrete beam in the concrete hydration heat temperature raising and temperature lowering process does not exceed the bearing capacity at that time; concrete pouring is performed, and recursive flow process construction of the ultra-long concrete floor structure is completed. According to the construction method, when concrete is mixed, constraining force of the concrete beam on the concrete floor is strictly measured, if requirements are not met, the mixing proportion of the concrete is readjusted, and thus the construction quality is guaranteed.

Description

technical field [0001] The invention relates to concrete construction in the field of building construction, in particular to a recursive flowing water construction method for an ultra-long concrete floor structure. Background technique [0002] In order to avoid shrinkage cracks during the service period and construction period caused by the super-long concrete floor structure, it is necessary to set up a post-shrinkage pouring belt. The post-shrinkage pouring belt is generally 1-2 meters wide and the spacing is 40-50 meters. The filling time of the shrinking post-casting belt is 2 to 3 months after the concrete pouring of the floors on both sides of the shrinking post-casting belt is completed. However, the post-casting belt cannot solve all the cracking problems of the floor slabs. Many floors with shrinking post-casting belts often crack. On the contrary, the shrinking post-casting belt has become a serious obstacle to the further development of concrete floor structure ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00E04G21/02
Inventor 戴耀军危鼎王桂玲马荣全胡亚锋刘相涛张庆煜王强马洪娟
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products