Construction method for land reclamation with modified phosphorous gypsum material

A technology of land reclamation and construction method, which is applied in the fields of water filling and land building, climate change adaptation, etc., can solve the problems of slow curing speed and other problems, and achieve the effect of improving curing speed and simple operation.

Inactive Publication Date: 2014-04-02
GUIZHOU KAILIN GRP CO LTD
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a construction method for land reclamation with modified phosphogypsum materials, which solves the problem of slow curing speed when modified phosphogypsum materials are used for land reclamation in the prior art

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] (1) Build the cofferdam with water-resistant building materials:

[0038] On the ocean shoal, use MU10 cement bricks and M5.0 mortar to build a cofferdam with a length and width of 10 meters, and use M5.0 mortar for internal plastering.

[0039] (2) Preparation of filling slurry:

[0040] The modified phosphogypsum material (fresh phosphogypsum and composite yellow phosphorus slag gelatinized powder) was forced to stir for 7 minutes, and then fresh water with 15% of the dry material weight was added and forced to stir for 10 minutes to obtain the modified phosphogypsum material for land reclamation.

[0041] (3) Preparation of filling body:

[0042] The prepared modified phosphogypsum material for land reclamation is poured into the cofferdam, and the filling body is formed by tamping with a vibrating pump.

[0043] (4) Covering and moisturizing, anti-drying maintenance:

[0044] The filling body is protected from wind and dryness by covering with wet sackcloth and w...

Embodiment 2

[0048] (1) Build the cofferdam with water-resistant building materials:

[0049] On the ocean shoal, use MU10 cement bricks and M5.0 mortar to build a cofferdam with a length and width of 20 meters, and use M5.0 mortar for internal plastering.

[0050] (2) Preparation of filling slurry:

[0051] Preparation of filling slurry: The modified phosphogypsum material (fresh phosphogypsum, water-quenched yellow phosphorus slag, cement) was forced to stir for 3 minutes, and then fresh water with a weight of 11% of the dry material was added for 15 minutes to obtain the modified phosphogypsum for land reclamation. Phosphogypsum material.

[0052] (3) Preparation of filling body:

[0053] The prepared modified phosphogypsum material for land reclamation is poured into the cofferdam, and the filling body is formed by tamping with a vibrating pump.

[0054] (4) Covering and moisturizing, anti-drying maintenance:

[0055] The filling body is protected from wind and drying by covering i...

Embodiment 3

[0059] (1) Build the cofferdam with water-resistant building materials:

[0060] On the ocean shoal, use MU10 cement bricks and M5.0 mortar to build a cofferdam with a length and width of 30 meters, and use M5.0 mortar for internal plastering.

[0061] (2) Preparation of filling slurry:

[0062] Preparation of filling slurry: The modified phosphogypsum material (fresh phosphogypsum, fly ash and cement) was forced to stir for 9 minutes, and then 5% of the dry material weight was added to the fresh water and forced to stir for 10 minutes to obtain the modified phosphogypsum material for land reclamation .

[0063] (3) Preparation of filling body:

[0064] The prepared modified phosphogypsum material for land reclamation is poured into the cofferdam, and the filling body is formed by rolling with a roller.

[0065] (4) Covering and moisturizing, anti-drying maintenance:

[0066] The filling body is protected from wind and dryness by covering it with geotextile and watering it...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
compressive strengthaaaaaaaaaa
compressive strengthaaaaaaaaaa
compressive strengthaaaaaaaaaa
Login to view more

Abstract

The invention discloses a construction method for land reclamation with modified phosphorous gypsum material. The method comprises the following steps of (1) constructing a cofferdam by using waterproof building materials; (2) preparing filling slurry; (3) preparing a filling body; (4) performing covering moisture preservation and windproof dry maintenance. The method is convenient, rapid and easy to operate; a cofferdam treatment method, a land reclamation material stirring process control method, a filling body forming construction method and a maintenance control method are improved, the length and the width of the cofferdam are determined, and the stirring mixing time of the materials, the water addition proportion and the water addition stirring time are determined, so that the solidification speed of the modified phosphorous gypsum material after the land reclamation can be remarkably increased, and the construction requirements of a land reclamation project are met.

Description

technical field [0001] The invention relates to the field of building materials, in particular to a construction method for land reclamation with modified phosphogypsum materials. Background technique [0002] According to the internal layout of reclamation projects, land reclamation models can be divided into integral reclamation and discrete reclamation; according to the plane design and implementation of reclamation projects, land reclamation can be divided into The modes are roughly divided into artificial island reclamation, shoreline extrapolation reclamation, and straight reclamation. No matter which land reclamation method is used, it is necessary to prepare land reclamation materials with a certain curing speed. The curing speed of land reclamation materials must meet the progress of land reclamation projects, which is crucial to the speed control and effect of project construction. The construction method of land reclamation materials also has a certain influence...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02B3/18C04B28/14
CPCY02A10/00
Inventor 杨步雷邓竹林杨永彬向前勇刘敏李泽钢王伟刘小成徐韦洪邹国军
Owner GUIZHOU KAILIN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products