Plugging agent for plugging oil-water well blast holes and casing pipe leakage parts in oil field
A technology for oil-water wells and plugging agents, which is applied in the field of plugging materials, can solve the problems of plugging cycle, operation occupied production space consumption, and slow growth of oil well cement strength, so as to shorten the workover period and operation occupied production time, and shorten the waiting period. Coagulation time, improve the effect of working efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0014] First take 80 parts by weight of sulfoaluminate clinker or fluoroaluminate clinker, 5 parts by weight of anhydrite, 40 parts by weight of microsilica and 5 parts by weight of anhydrous sodium sulfate to make a specific surface area ≥ 360m 2 The hydraulic gelling material of / Kg; Get the tartaric acid of 5 weight parts, the citric acid of 0.1 weight part, the boric acid of 10 weight parts and the water of 80 weight parts to make density be 1.8g / cm 3 retarder aqueous solution; when used in the oil field, according to hydraulic cementitious material: retarder aqueous solution=1:0.4 parts by weight, the density is 1.75g / cm 3 1. The slurry with a water-cement ratio of 0.5 is injected into the oil-water well by a pump truck.
Embodiment 2
[0016] First take 40 parts by weight of sulfoaluminate clinker or fluoroaluminate clinker, 20 parts by weight of anhydrite, 10 parts by weight of microsilica and 10 parts by weight of anhydrous sodium sulfate to make a specific surface area ≥ 360m 2 The hydraulic gelling material of / Kg; Get the tartaric acid of 0.1 weight part, the citric acid of 15 weight parts, the boric acid of 5 weight parts and the water of 95 weight parts to make density be 1.6g / cm 3 retarder aqueous solution; when used in the oil field, according to hydraulic cementitious material: retarder aqueous solution = 1:0.8 parts by weight to make a density of 1.6g / cm 3 , The slurry with a water-cement ratio of 0.7 is injected into the oil-water well with a pump truck.
Embodiment 3
[0018] First take 60 parts by weight of sulfoaluminate clinker or fluoroaluminate clinker, 12 parts by weight of anhydrite, 25 parts by weight of microsilica and 8 parts by weight of anhydrous sodium sulfate to make a specific surface area ≥ 360m 2 The hydraulic gelling material of / Kg; Get the tartaric acid of 3 weight parts, the citric acid of 7 weight parts, the boric acid of 7 weight parts and the water of 85 weight parts to make density be 1.7g / cm 3 retarder aqueous solution. When used in the oil field, the density is 1.7g / cm according to the ratio of hydraulic cementitious material: retarder aqueous solution = 1: 0.6 parts by weight 3 , The slurry with a water-cement ratio of 0.6 is injected into the oil-water well by a pump truck.
PUM
Property | Measurement | Unit |
---|---|---|
Density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com