Cascading waterfall waterscape structure on artificial stacked mountain and construction method thereof
A technology for stacking and mountain bodies, which is applied to the waterscape structure of stacked water waterfalls on artificial stacking bodies and its construction field, can solve problems such as affecting the quality of waterscape projects, water leakage, etc. The effect of consolidation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Example 1: Combining Figure 1 to Figure 6 Illustrate the waterscape structure of stacking water waterfall on the artificially piled mountain body of the present invention, as figure 2 As shown, the cascading water waterfall waterscape structure of this embodiment is composed of two parts: a pool body 10 located on an artificially built mountain, and a river bed 11 connected to the pool body 10 and winding down. Such as figure 1 As shown, the artificially piled mountains under the pool body 10 and the riverbed 11 are artificially piled up from the original floor elevation of about 5 meters to the highest point of about 11 meters. Ordinary planting soil layer 2 and high-quality planting soil layer 3. Among them, the base layer 1 at the bottom is made of construction waste free of pollutants and radioactive substances, and an appropriate amount of plain soil is added to strengthen the bond. The ordinary planting soil layer 2 has a thickness of 2 meters, and the high-q...
Embodiment 2
[0039] Embodiment 2: Combination Figure 1 to Figure 7 Illustrate the construction method of the water feature structure of the cascading water waterfall on the artificially piled mountain body of the present invention, and the steps are as follows:
[0040] S101: According to the construction drawings, carry out the positioning and stakeout of the artificial piled mountain, set the necessary control stakes, etc. to ensure that the plane shape and contour line of the mountain conform to the drawings, and set up the settlement observation point and the deep horizontal displacement control point before the mountain is piled up. The pore water pressure control point, the artificially piled mountain body is base layer 1, ordinary planting soil layer 2 and high-quality planting soil layer 3 from bottom to top. The layered stacking method is adopted, soil is transported by dump truck, paved by bulldozer, and compacted by road roller. Every time the pile is one meter high, the slope ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com