Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Integral casting construction method for cable trench of highway tunnel water ditch

A water trench cable trough and integral pouring technology, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc., can solve the problems of poor integrity, high construction cost of formwork engineering, and long cycle time, and achieve smoothness and linearity. The effect of improving the structural appearance quality and formwork integrity

Inactive Publication Date: 2015-02-04
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 1ST ENG
View PDF8 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the prior art, the construction of tunnel gutters and cable troughs is done by pouring concrete in stages, and the formwork is supported multiple times. The geometric dimensions and line types of trenches and cable troughs will reduce the quality of the project
[0003] The construction of the traditional tunnel trench cable trough is constructed in sections using small combined steel molds. The construction process includes assembly, reinforcement, pouring, disassembly, transition, cleaning and oiling. The process is complicated, the cycle time is long, and there are many reinforcement supports. Poor performance, difficult to control the appearance quality, high construction cost of formwork

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Integral casting construction method for cable trench of highway tunnel water ditch
  • Integral casting construction method for cable trench of highway tunnel water ditch
  • Integral casting construction method for cable trench of highway tunnel water ditch

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0018] The above and other technical features and advantages of the present invention will be described in more detail below in conjunction with the accompanying drawings.

[0019] see figure 1 , 2 As shown in and 3, it is a front view and a side view structural schematic diagram of the highway tunnel section and the integral mobile ditch cable trough construction formwork system of the present invention. In the present invention, the tunnel groove area 2 is arranged on the left and right sides of the tunnel driving area 1 , a support portion 61 is set between the two areas, which is higher than the bottom end of the tunnel groove area 2 and is at the same height as the edge portion 21 of the tunnel groove area 2, and is near the groove between the edge portion 21 and the support portion 61 One side of the groove tunnel area is respectively provided with a first support groove 22, and the bottom of the tunnel groove area 2 is provided with a second support groove 62 near the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an integral casting construction method for a cable trench of a highway tunnel water ditch. The method comprises the following steps of in the construction process of the cable trench of the tunnel water ditch, firstly, prefabricating a movable bracket structure and a matched shaping formwork, and suspending the shaping formwork through a first screw rod and a second screw rod; moving and adjusting the shaping formwork to the preset position by the movable bracket, fixing the relative position between the shaping formworks and the relative position between the corresponding shaping formwork and a bracket structure by a first support groove, a second support groove and a steel channel frame, fixing the formworks, and then casting the structure; after forming and demoulding of the structure, moving a whole form frame to the concrete casting position of the next form through manual pushing or mechanical traction, and repeating the steps to complete the casting. The integral casting construction method has the advantages that a new construction method for the integral movement of the form frame system of the cable trench of the tunnel water ditch is provided, a movement and suspension system is updated, the process updateability and the operability are higher, the flatness and line shape of the structure are more attractive, and the one-time vertical form casting and forming can be realized.

Description

technical field [0001] The invention relates to the field of tunnel construction, in particular to an integral pouring construction method for a highway tunnel water ditch cable groove. Background technique [0002] In the prior art, the construction of tunnel gutters and cable troughs is done by pouring concrete in stages, and the formwork is supported multiple times. The geometric dimensions and line types of trenches and cable troughs will reduce the quality of the project. [0003] The construction of the traditional tunnel trench cable trough is constructed in sections using small combined steel molds. The construction process includes assembly, reinforcement, pouring, disassembly, transition, cleaning and oiling. The process is complicated, the cycle time is long, and there are many reinforcement supports. The performance is poor, the appearance quality is difficult to control, and the construction cost of the formwork project is high. [0004] In view of the above-m...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D11/10
CPCE21D11/102
Inventor 岳旭光宋战平王学民张恩达李赐仁牛泽林
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP 1ST ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products