Method for casting special high-alloy steel track shoe for large mining machinery
A high-alloy steel and track shoe technology, which is applied to casting molding equipment, casting molds, cores, etc., can solve problems such as high maintenance costs, serious surface wear, and short track life, so as to reduce maintenance costs, prolong service life, low cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0024] Embodiment 1: A casting method of high-alloy steel track shoes for large-scale mining machinery, comprising the following steps:
[0025] Step 1: Model preparation. Before modeling and core making, it is necessary to confirm that the mold is qualified and make a mark.
[0026] Step 2: Molding, through the alkali phenolic resin sand process, and after the molding is completed, the sand mold and the mold are separated from the mold.
[0027] Step 3: paint baking, the time interval between paint baking and sand mold ejection should not be less than 2 hours, bake before coating, heat slowly and evenly when heating and baking, and change it when the surface of the sand mold has water vapor overflowing. For high-fire baking, the surface temperature of the sand mold is controlled at 150°C until the water vapor runs out. The baking is divided into at least 2 times, with an interval of half an hour between each baking. When the temperature of the sand mold drops to the point whe...
Embodiment 2
[0036] Embodiment 2: A casting method of high-alloy steel track shoes for large-scale mining machinery, comprising the following steps:
[0037]Step 1: Model preparation. Before modeling and core making, it is necessary to confirm that the mold is qualified and make a mark.
[0038] Step 2: Molding, through the alkali phenolic resin sand process, and after the molding is completed, the sand mold and the mold are separated from the mold.
[0039] Step 3: paint baking, the time interval between paint baking and sand mold ejection should not be less than 2 hours, bake before coating, heat slowly and evenly when heating and baking, and change it when the surface of the sand mold has water vapor overflowing. For high-fire baking, the surface temperature of the sand mold is controlled at 180°C until the water vapor runs out. The baking is divided into at least 2 times, with an interval of half an hour between each baking. When the temperature of the sand mold drops to the point wher...
Embodiment 3
[0047] Embodiment 3: A casting method of high-alloy steel track shoes for large-scale mining machinery, comprising the following steps:
[0048] Step 1: Model preparation. Before modeling and core making, it is necessary to confirm that the mold is qualified and make a mark.
[0049] Step 2: Molding, through the alkali phenolic resin sand process, and after the molding is completed, the sand mold and the mold are separated from the mold.
[0050] Step 3: paint baking, the time interval between paint baking and sand mold ejection should not be less than 2 hours, bake before coating, heat slowly and evenly when heating and baking, and change it when the surface of the sand mold has water vapor overflowing. For high-fire baking, the surface temperature of the sand mold is controlled at 165°C until the water vapor runs out. The baking is divided into at least 2 times, with an interval of half an hour between each baking. When the temperature of the sand mold drops to the point whe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com