Bridge drain pipe construction installation technology

An installation process and a technology for drain pipes, applied in bridges, bridge parts, bridge construction, etc., can solve the problems of building collapse, non-vertical installation of drain pipes, and unequal drain grates, and achieve good filling and bonding effects, excellent Anti-acid and alkali performance, easy pouring construction effect

Active Publication Date: 2015-04-01
CHINA RAILWAY SHISIJU GROUP CORP +1
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] my country's bridge drainage generally adopts drain pipes to automatically guide water outwards. This drainage method is simple, fast, and practical, but the following problems are prone to occur during installation: the elevation of the drain pipe is higher than the road surface elevation, and the drainage effect is poor during use; The installation of the water pipe is not vertical, resulting in uneven drain grates and poor driving comfort of the vehicle; the seal around the drain pipe is not tight, which is prone to cracks in the building, and water stays from the outer wall of the drain pipe and along the beam, which not only affects the performance of the bridge The appearance, and the cracks will surround and corrode the steel reinforcements placed in it, shorten the service life of the building, lead to the collapse of the building in severe cases and affect the quality of the bridge

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

preparation example Construction

[0031] The present invention also includes a kind of preparation method of non-shrinkage epoxy grouting material, comprises the following steps:

[0032] (1) Preparation of organosilicon-modified bisphenol-A epoxy resin: add bisphenol-A epoxy resin with a molar ratio of 4:1~2 and organosilane containing terminal chlorine into toluene and dissolve to obtain a mixed solution , add triethylamine dropwise to the mixed solution, control the reaction temperature when dropping triethylamine to be 20~40°C, react at 25~30°C for 1 hour after the dropwise addition, to obtain the reaction solution, rinse the reaction solution with distilled water , the reaction solution was distilled under reduced pressure to obtain a light yellow organosilicon-modified bisphenol A epoxy resin; the molar ratio of triethylamine to organosilane containing terminal chlorine was 3 to 4:1; the volume ratio of distilled water to the reaction solution 5~10:1;

[0033] (2) Stir and mix 5-8 parts by weight of asb...

Embodiment 1

[0041] A construction and installation process for a bridge drain pipe, comprising the following steps:

[0042] (1) Use PVC pipes to bury the drain pipe holes, ensure that the pre-embedded holes are vertical, and pour concrete on the box girder around the PVC pipes: when pre-buried, the top of the PVC pipe is 5 cm higher than the top surface of the box girder; the PVC The pipe is filled with sand before embedding, and the two ends are sealed with wide tape; during installation, the inclination of the bottom of the PVC pipe and the steel mold of the flange plate are accurately controlled, and the verticality of the pre-embedded pipe is controlled with a level to ensure that the pre-embedded The hole is vertical, and the embedded PVC pipe is welded and fixed with "#" shaped steel bars around it, and then concrete is poured for the box girder around the PVC pipe;

[0043] (2) Cut out the PVC pipe, cut out the installation groove on the top of the bridge deck, put the drain pipe ...

Embodiment 2

[0052] A construction and installation process for a bridge drain pipe, comprising the following steps:

[0053] (1) Use PVC pipes to bury the drain pipe holes, ensure that the pre-embedded holes are vertical, and pour concrete on the box girder around the PVC pipes: when pre-buried, the top of the PVC pipe is 5 cm higher than the top surface of the box girder; the PVC The pipe is filled with sand before embedding, and the two ends are sealed with wide tape; during installation, the inclination of the bottom of the PVC pipe and the steel mold of the flange plate are accurately controlled, and the verticality of the pre-embedded pipe is controlled with a level to ensure that the pre-embedded The hole is vertical, and the embedded PVC pipe is welded and fixed with "#" shaped steel bars around it, and then concrete is poured for the box girder around the PVC pipe;

[0054] (2) Cut out the PVC pipe, cut out the installation groove on the top of the bridge deck, put the drain pipe ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
diameteraaaaaaaaaa
heightaaaaaaaaaa
heightaaaaaaaaaa
Login to view more

Abstract

The invention discloses a bridge drain pipe construction installation technology. The bridge drain pipe construction installation technology comprises the steps that a drain pipe hole is buried through a PVC pipe to ensure that the pre-buried hole is perpendicular; concrete pouring is conducted on box girders around the PVC pipe; a drain pipe is fixedly installed after the PVC pipe is removed through chiseling operation; the periphery of the pipe wall of the drain pipe and an installation groove are blocked off through a contraction-free epoxy grouting material. According to the bridge drain pipe construction installation technology, the situations that the drain pipe is installed perpendicularly, and a drain perforated strainer is horizontal are guaranteed, and comfort of vehicle travelling is ensured; the contraction-free epoxy grouting material adopted by the bridge drain pipe construction installation technology is proper in viscosity, and has good filling performance, and pouring construction can be easy; various kinds of padding of the bridge drain pipe construction installation technology can be uniformly distributed in epoxy resin through matching in proper proportions, and have good filling and bonding effects; the contraction-free epoxy grouting material is applicable to construction in various complex environments, and has excellent acid and alkali resistance performance, water accumulation and water seepage cannot happen after grouting construction is accomplished, blocking is firm and dense, and compressive strength is high.

Description

technical field [0001] The invention relates to the technical field of bridge construction, in particular to a construction and installation process for a bridge drain pipe. Background technique [0002] my country's bridge drainage generally adopts drain pipes to automatically guide water outwards. This drainage method is simple, fast, and practical, but the following problems are prone to occur during installation: the elevation of the drain pipe is higher than the road surface elevation, and the drainage effect is poor during use; The installation of the water pipe is not vertical, resulting in uneven drain grates and poor driving comfort of the vehicle; the seal around the drain pipe is not tight, which is prone to cracks in the building, and water stays from the outer wall of the drain pipe and along the beam, which not only affects the performance of the bridge The appearance, and the cracks will surround and corrode the steel reinforcement placed therein, shorten the se...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/08C04B28/00C04B24/28C04B111/70
CPCC08L63/00C08L2205/025E01D19/086E01D21/00C08K7/12C08K2003/2227C08K3/34
Inventor 李猛赵鲁滨金龙
Owner CHINA RAILWAY SHISIJU GROUP CORP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products