Prepositioned turbogenerator room combined with side coal cabin and arranged on high position
A technology of turbo generators and side coal bunkers, which is applied in the direction of machines/engines, mechanical equipment, steam engine devices, etc., and can solve problems such as cost increase
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0073] image 3 It is a structural diagram of the front steam turbine generator room with side coal bunkers combined with high-level arrangement in Embodiment 1 of the present invention.
[0074] and figure 2 Compared with the main workshop of the steam turbine generator shown, the present invention arranges the front machine room of a single unit above the side coal bunker through the side coal bunker frame.
[0075] The structure of the front steam turbine generator room with side coal bunker combined with high position arrangement of the present invention includes: 2 boilers, a side coal bunker room located in the middle of the boiler, 2 oxygen removal rooms, the first steam turbine generator, and the second steam turbine generator machine and denitrification steel frame; wherein, a deoxygenation room is set on the side adjacent to the proximal end of the side coal bunker, a turbine room is set on the side adjacent to the deoxygenation room, and a second steam room is set...
Embodiment 2
[0082] Figure 4 It is a structural diagram of the front steam turbine generator room with side coal bunkers combined with high-level arrangement in Embodiment 2 of the present invention.
[0083] Embodiment 2 of the present invention is similar to Embodiment 1, with the difference that: the front-end machine rooms of the two first steam turbine generators are combined and arranged above the side coal bunker located in the middle of the two boilers. The volume of the front-end machine room of the two units is 72000m 3 .
[0084] The high-positioned pre-turbine generator room in this embodiment 2 can reduce the site of the main steam pipeline by 50%-60%, and the relative length of the main steam pipeline can reach 3 / 10, and the absolute length is ≤40m. The length of the connecting piping system can be shortened to 60m, the cost of the main steam pipeline can be saved by 45%, the overall cost can be reduced by 18%, and the pipeline efficiency can be increased by more than 58%....
PUM
Property | Measurement | Unit |
---|---|---|
Length | aaaaa | aaaaa |
Volume | aaaaa | aaaaa |
Volume | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com