Multi-level regional connection construction method of regional buried vertical tube horizontal connecting system

A technology of horizontal connection and construction method, applied in the direction of pipes/pipe joints/fittings, excavation, infrastructure engineering, etc., which can solve the problem that the large-area design elevation plane of the horizontal main pipe cannot be obtained, the exposure time of the foundation pit is long, and there are potential safety hazards, etc. problems, to achieve the effect of shortening exposure time, shortening construction period, and reducing construction work surface

Inactive Publication Date: 2015-04-29
CHINA MCC20 GRP CORP
View PDF2 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the excavation sequence of the deep foundation pit generally advances from the periphery or both ends to the middle. In addition, the interior of the deep foundation pit needs to be transported repeatedly during the excavation process, so that the large-area design elevation plane of the horizontal main pipe is basically impossible to obtain.
In addition, the vertical pipes are connected in parallel, the flow rate of the horizontal main pipes gradually increases, and the diameter needs to be gradually enlarged. Not only the accessories are complicated, but also the connection is difficult, and there is a risk of leakage at the connection
At the same time, such construction results in a long exposure time of the foundation pit, which poses a safety hazard.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-level regional connection construction method of regional buried vertical tube horizontal connecting system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] Such as figure 1 As shown: a horizontal connection system of regional underground vertical pipes, which includes several vertical pipes 1, and a set of water collectors (including water separators 21 and water collectors 22), a number of water distribution branch pipes 3 and Water collection branch pipe 4, horizontal main pipe 23, described water divider 21 and water collector 22 extend to outside the foundation pit through horizontal main pipe 23; Described water divider 21 connects vertical pipe 1 and water distribution branch pipe 21 respectively, so The water collector 22 is respectively connected to the vertical pipe 1 and the water collection branch pipe 22; the multi-stage partition connection construction method includes:

[0022] Step 1, excavation of the foundation pit: when excavating the foundation pit, determine the horizontal connection construction area of ​​the buried vertical pipe;

[0023] Step 2, excavation of sub-catchment pits: Excavate sub-catchme...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to regional buried vertical tube horizontal connecting construction, in particular to a regional buried vertical tube horizontal connecting system. The system comprises a plurality of vertical pipes, a set of water-distributing and collecting device (including a water-distributing device and a water-collecting device), a plurality of water-distributing branch pipes, a plurality of water-collecting branch pipes and horizontal dry pipes, wherein the water-distributing device and the water-collecting device extend out of a foundation pit through the horizontal dry pipes; the water-distributing device is respectively connected to the vertical pipes and the water-distributing branch pipes; the water-collecting device is respectively connected to the vertical pipes and the water-collecting branch pipes. A construction method of the regional buried vertical tube horizontal connecting system comprises the following steps of digging the foundation pit; digging a water-distributing device pit and a water-collecting device pit; flushing the vertical pipes; performing a bulge test; connecting the vertical tubes to the water-distributing device and the water-collecting device; after connecting the horizontal dry pipes to the water-distributing device and the water-collecting device, guiding the horizontal dry pipes to the periphery of the foundation pit. Due to the fact that the water-distributing device and the water-collecting device are connected to the buried vertical tubes in some region, a horizontal equal-stroke connection construction surface of the buried vertical tubes can be broken into parts; generally, when the foundation pit is dug, a construction operation surface of the small region is easily realized.

Description

technical field [0001] The invention relates to the construction of buried pipes in large foundation pits, in particular to the horizontal connection construction of regional buried vertical pipes. Background technique [0002] In the ground source heat pump buried pipe project under the building foundation, the horizontal connection of the vertical buried pipe needs to obtain the pipe trench work surface along the horizontal main pipe, that is, the horizontal main pipe needs to be excavated along the vertical pipe direction on the same straight line pipe trench, and then connect the vertical pipes to the horizontal main pipes. [0003] The traditional construction technology needs to wait until most of the excavation of the foundation pit is completed, and the vertical pipe can be buried before the horizontal connection construction can be carried out. However, the excavation sequence of the deep foundation pit generally advances from the periphery or both ends to the midd...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F16L1/028E02D17/02
CPCF16L1/028E02D17/02
Inventor 曹杨陆秋虹周国明雷波
Owner CHINA MCC20 GRP CORP
Features
  • Generate Ideas
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More