Super-large cofferdam with bamboo raft piles and construction method for sea reclamation with super-large cofferdam with bamboo raft piles
A construction method and land reclamation technology, applied in infrastructure engineering, construction, etc., can solve the problem of scarcity of sand resources, achieve rich resources, reduce the risk of air leakage, and achieve quick results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The accompanying drawings show the technical solution of the present invention and its embodiments, and the relevant details and working principles of the embodiments will be further described below in conjunction with the accompanying drawings.
[0048] refer to figure 1 , figure 2 , image 3 As shown, the super-large cofferdam of bamboo raft piles provided by the present invention includes at least three layers of bamboo fence 1, and the bamboo fence 1 described in this embodiment is provided with three layers from the inside to the outside, and each bamboo fence The height of the wall 1 gradually decreases from the inside to the outside. The bamboo wall 1 includes a moso bamboo frame 2 constructed of moso bamboo poles. The moso bamboo crossbar 5 that is set, the positions of the moso bamboo stake 3, the moso bamboo strut 4 and the moso bamboo crossbar 5 intersect are bound and fixed, the moso bamboo pile 3 is driven deep into the soil, and the moso bamboo fence 1 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


