Power failure control system and method
A power-off control and controller technology, applied in the field of control, can solve the problems that users do not pay property management fees and other fees in time, and affect the operation and management of property management companies, so as to ensure timeliness, ingenious design, and convenient use Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] In order to improve the timeliness of payment of property management fees and other fees, ensure the normal operation and management of property management companies, so as to ensure the living experience of users in the entire community, such as figure 1 As shown, the embodiment of the present invention provides a power-off control system, including: a power-off controller 100, an IC card 103, a card reader 102, and a power-off device 101;
[0049] Wherein, the IC card 103 refers to an integrated circuit card (Integrated Circuit Card), also called a smart card (Smart card). In the embodiment of the present invention, preferably the IC card 103 is a rechargeable smart card for storing user information and account amount. There is no need to go to the property to pay the corresponding fee, just deposit the required fee in the IC card 103 and get final product.
[0050] The card reader 102 is used to read the user information and the account amount stored in the IC card ...
Embodiment 2
[0067] Such as image 3 As shown, the embodiment of the present invention provides a power-off control method, which is applied to a power-off control system. The system includes a power-off controller, an IC card, a card reader, and a power-off device. The method includes:
[0068] Step S200: the card reader reads the user information and account amount stored in the IC card;
[0069] Step S201: The power-off controller obtains the user information and account amount read by the card reader, and judges whether the account amount satisfies the total amount of fees required by the user. Step S202: If not, send The power-off device sends a power-off command for power-off at a preset time;
[0070] Step S203: The power cutoff device cuts off the power supply of the user's residence at the preset time according to the power cutoff instruction.
[0071] Considering that the user will pay the fee before the recharge deadline—before the preset time, and there is no need to cut off ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com