Long-span section mandrel in open cut construction and treatment method thereof
A processing method and technology in construction, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve problems such as increased construction costs, and achieve the effect of stable and reliable core mold, low cost, and overall stability.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] Accompanying drawing is a kind of specific embodiment of the present invention. This embodiment comprises several parallel circular rings 1, and the circular rings 1 are connected with connecting steel bars 2, and the surroundings of the circular rings 1 are evenly provided with moso bamboo sheets 3, and the moso bamboo sheets 3 are covered with tin sheets 4, and the two ends are blocked with bamboo plywood 5 . The distance between rings 1 is 1m. There are three connecting steel bars 2, which are evenly arranged around the ring 1. The ring 1 is made of Ф12 threaded steel, and the connecting steel bar 2 is made of Ф10 threaded steel.
[0022] Using the processing method of the large-span cross-section mandrel in open excavation construction of the present invention, first use Ф12 threaded steel to make several circular rings 1 of the required mandrel size, and then use Ф10 threaded steel to make these circular rings 1 Connect them to form a cylindrical shape (the dist...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 