A kind of oil production method of casing leakage well and its double-pipe oil production string
A technology for leaking wells and oil production pipes, applied in the field of downhole oil production pipe strings, can solve problems such as difficulty in re-repair, sand production at leak points, poor suction at leak points, etc., achieve good promotion and application value, solve casing leakage problems, and have reliable working performance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] see figure 1 , the double-pipe production string used for the oil production method of a casing leakage well includes a tubing 2, a packer 5 is seated between the tubing 2 and the casing 1, and is located above the oil layer below the casing leakage point, and the tubing 2 The small-diameter tubing 4 and the small-diameter tubular pump 3 are lowered into the middle, the tubing 2 is suspended at the wellhead through the lower tubing head 7, and the small-diameter tubing 4 is connected to the pump barrel of the small-diameter tubular pump 3 and suspended at the wellhead through the upper tubing head 6 , can realize the operation of flushing the well and measuring the liquid level, the packer 5 is no longer invalidated by the influence of the alternating load, the sealing effect is good, and the validity period is long. The inner diameter of the lower oil pipe head 7 is greater than the inner diameter of the upper oil pipe head 6, and the upper oil pipe head 6 is threadedl...
Embodiment 2
[0022] see figure 2 , the double-pipe production string used for the oil production method of a casing leakage well includes a tubing 2, a packer 5 is seated between the tubing 2 and the casing 1, and is located above the oil layer below the casing leakage point, and the tubing 2 Insert the hollow sucker rod 8 and the rod type oil well pump 9 in the middle, and the support sleeve of the rod type oil well pump 9 is fixed on the oil pipe 2 . The support sleeve of the rod well pump 9 can also be fixed on the tubing 2 below the packer 5. If the support sleeve is fixed below the packer 5, the validity period will be longer and the ferrule leakage effect will be better. The oil pipe 2 above the device 5 leaks, and oil recovery is also possible. The diameter of the hollow sucker rod 8 is 36mm; the diameter of the oil pipe 2 is 89mm, and the hollow sucker rod 8 serves as a liquid flow channel.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

