Method for applying BIM and 3D printing technology to construction

A 3D printing and construction technology, applied in the direction of digital output to printing unit, additive processing, etc., can solve problems such as lack of understanding of high technology, failure to find problems in time, loss, etc., to improve usability and quality, and improve communication. effect, the effect of enhanced control

Inactive Publication Date: 2015-12-30
CHINA MCC17 GRP
View PDF3 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The design of the project needs to be reviewed in the early stage of the construction project. The design institute issues two-dimensional drawings, and each major draws separately. The project participants may not have considered thoroughly in the early stage, and some problems have not been discovered in time. After the project is put into use, it will bring inevitable losses. In recent years, BIM technology has been valued by the construction industry. The 3D information model has brought great help to project management, but there are also some shortcomings. The proje

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for applying BIM and 3D printing technology to construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] The preferred modes of the present invention will be described in further detail below in conjunction with the examples.

[0014] like figure 1 As shown, a method of applying BIM and 3D printing technology in construction includes the following steps:

[0015] 1) Transform the design blueprint of the construction project into a 3D building information model with Revit software. After checking the rationality and errors of the drawing design in the 3D information model, professional engineers use the collision detection function of Revit software to detect pipelines. Out of the collision point, modify and optimize the pipeline layout.

[0016] 2) Export the 3D building information model in dwf format, open it with Navisworks, render the 3D information model with Navisworks software, and check the rationality of the spatial layout of the building through roaming.

[0017] 3) After confirming the rationality of the 3D information model, connect with the 3D printer and pr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method for applying a BIM and a 3D printing technology to construction. The method comprises the following steps: 1) establishing a three-dimensional building information model; 2) deriving the three-dimensional building information model in the format of dwf, opening the three-dimensional building information model through Navisworks, using Navisworks software to render the three-dimensional building information model, and examining rationality of spatial arrangement of a building through roaming; 3) after the rationality of the three-dimensional building information model is determined, connecting a 3D printer, and printing a needed model; 4) causing project participators to examine rationality of the printed model and timely feed problems back to model establishing engineers, and causing the professional engineers to adjust the model according to modifications given by a design institute, so that the building use rationality is guaranteed and the problems are obtained at an earlier construction stage. By combining the BIM and the 3D printing technology, the control on a construction process is reinforced, building usability and quality are improved, and the cost is reduced. The communication effect is improved through the method.

Description

technical field [0001] The invention belongs to the technical field of construction engineering, and in particular relates to a method for applying BIM and 3D printing technology in construction. Background technique [0002] The design of the project needs to be reviewed in the early stage of the construction project. The design institute issues two-dimensional drawings, and each major draws the drawings separately. The project participants may not have considered well in the early stage, and some problems have not been discovered in time. After the project is put into use, it will bring inevitable losses. In recent years, BIM technology has been valued by the construction industry. The 3D information model has brought great help to project management, but there are also some shortcomings. The project is carried out by multiple units and personnel. After completion, some construction personnel may not know much about high technology, and some construction workers have not r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F3/12B33Y50/00
Inventor 汪芦金
Owner CHINA MCC17 GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products