Method of drawing pilot rope by unmanned aerial vehicle for river-crossing construction

A construction method and pilot cable technology, applied in the erection/assembly of bridges, bridges, buildings, etc., can solve the problems of long time of closing air and road, potential safety hazards, and difficult construction, so as to save costs, reduce construction risks, The effect of shortening the construction period

Active Publication Date: 2016-01-20
CCCC SHEC SECOND ENG +2
View PDF6 Cites 9 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In mountainous bridges with high mountains and steep slopes, rich vegetation, rapid water flow, bridges with deep rivers and seas, complex hydrology, and many navigable ships, and bridges crossing roads and lines, the pilot cable construction adopts the conventional artificial ground pulling method or aerial traction. method (rocket throwing rope method, helicopter, remote-controlled airship), high cost, difficult construction, long time of air closure and road closure, and there are potential safety hazards

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method of drawing pilot rope by unmanned aerial vehicle for river-crossing construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] In order to overcome the problems existing in the prior art, it provides a safe and efficient erection method for pulling a leading cable across a river without interruption of traffic, free from terrain and hydrological restrictions, short operation time, low risk, and safety.

[0028] This embodiment provides a figure 1 The shown construction method of unmanned aerial vehicle towing the pilot cable across the river includes the following steps:

[0029] 1) On the top of the tower at one end of the bridge at the starting point 5, place the pilot cable reel 4 and the UAV 1;

[0030] 2) Pull out the pilot cable 2 from the cable reel 4 to connect with the UAV 1, and at the same time bind the counterweight 3 to the pilot cable 2;

[0031] 3) The UAV 1 pulls the pilot cable 2 and flies to the top of the bridge at the other end of the terminal 6;

[0032] 4) The operator pulls and catches the pilot cable 2 on the top of the tower, the UAV 1 releases the connection with the...

Embodiment 2

[0035] This embodiment provides a figure 1 The shown construction method of unmanned aerial vehicle towing the pilot cable across the river includes the following steps:

[0036] 1) On the top of the tower at one end of the bridge at the starting point 5, place the pilot cable reel 4 and the UAV 1;

[0037] 2) Pull out the pilot cable 2 from the cable reel 4 to connect with the UAV 1, and at the same time bind the counterweight 3 to the pilot cable 2;

[0038] 3) The UAV 1 pulls the pilot cable 2 and flies to the top of the bridge at the other end of the terminal 6;

[0039] 4) The operator pulls and catches the pilot cable 2 on the top of the tower, the UAV 1 releases the connection with the pilot cable 2, and manually anchors the pilot cable 2 to the anchor point 7 on the tower top.

[0040] Among them, as a preferred embodiment, in the step 1) and step 3), one end of the bridge as the starting point (5) and the ending point (6) includes the tower top and the ground. The ...

Embodiment 3

[0042] This embodiment provides a figure 1 The shown construction method of unmanned aerial vehicle towing the pilot cable across the river includes the following steps:

[0043] 1) On the top of the tower at one end of the bridge at the starting point 5, place the pilot cable reel 4 and the UAV 1;

[0044] 2) Pull out the pilot cable 2 from the cable reel 4 to connect with the UAV 1, and at the same time bind the counterweight 3 to the pilot cable 2;

[0045] 3) The UAV 1 pulls the pilot cable 2 and flies to the top of the bridge at the other end of the terminal 6;

[0046] 4) The operator pulls and catches the pilot cable 2 on the top of the tower, the UAV 1 releases the connection with the pilot cable 2, and manually anchors the pilot cable 2 to the anchor point 7 on the tower top.

[0047] Wherein, as a preferred embodiment, the UAV 1 is a remote-controlled aircraft equipped with an inertial navigation system. The remote-controlled aircraft is a four-rotor aircraft or a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention provides a method of drawing a pilot rope by an unmanned aerial vehicle for river-crossing construction. The method comprises the steps that: one worker arranges a pilot rope winding disc and an unmanned aerial vehicle on tower top of one end of a bridge at the initial point; the worker draws the pilot rope from the pilot rope winding disc to be connected with the unmanned aerial vehicle, and simultaneously binds a balancing weight on the pilot rope; the unmanned aerial vehicle draws the pilot rope and flies to tower top of the other end of the bridge; and another worker pulls and receives the pilot rope on the tower top, the unmanned aerial vehicle relieves connection with the pilot rope, and the worker manually anchors the pilot rope on an anchoring portion of the tower top. According to the method, the complete dynamic flight mode is designed and developed, construction period is short, cost is low, navigation and traffic are not closed really, limitation by topography, hydrology and traffic is prevented, and construction risk is also reduced, thereby facilitating popularization and application.

Description

technical field [0001] The invention relates to the technical field of bridges, in particular to a construction method for crossing a river by a pilot cable pulled by an unmanned aerial vehicle. Background technique [0002] When erecting the traction system of a suspension bridge, when it is difficult to directly erect the traction cable of the traction system, it is first necessary to erect a pilot cable thinner and lighter than the traction cable, and then use the pilot cable to form the traction system. [0003] In mountainous bridges with high mountains and steep slopes, rich vegetation, rapid water flow, bridges with deep rivers and seas, complex hydrology, and many navigable ships, and bridges crossing roads and lines, the pilot cable construction adopts the conventional artificial ground pulling method or aerial traction. The method (rocket throwing rope method, helicopter, remote-controlled airship), high cost, difficult construction, long time for air closure and r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00
Inventor 先正权梁进达赵强艾国清梁彬彬蒋能世
Owner CCCC SHEC SECOND ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products